REAL TIME ASSESSMENT OF 500-KVA, 11/0.415 KV DISTRIBUTION TRANSFORMER SITUATED AT BELLS UNIVERSITY OF TECHNOLOGY, OTA, OGUN STATE USING FLUKE 435 SERIES II
Distribution transformer being major equipment in utility companies deserves to be routinely scrutinized for its performance with a view to ensure continuous supply of energy to end-users as well as to sustain improved revenue collection by the utility company. Presented in this paper is the real t...
Main Authors: | ABRAHAM OLATIDE AMOLE, KAZIM IDOWU OKUSAGA, OLUFEMI OLANREWAJU ODEKUNLE, IKECHUKWU JOSEPH ODITA |
---|---|
Format: | Article |
Language: | English |
Published: |
Alma Mater Publishing House "Vasile Alecsandri" University of Bacau
2020-06-01
|
Series: | Journal of Engineering Studies and Research |
Subjects: | |
Online Access: | https://www.jesr.ub.ro/1/article/view/164 |
Similar Items
-
REAL TIME ASSESSMENT OF 500-KVA, 11/0.415 KV DISTRIBUTION TRANSFORMER SITUATED AT BELLS UNIVERSITY OF TECHNOLOGY, OTA, OGUN STATE USING FLUKE 435 SERIES II
by: ABRAHAM OLATIDE AMOLE, et al.
Published: (2020-06-01) -
5KVA automatic regulated inductive load bank /
by: 268099 Norzaide Mohd. Nor, et al.
Published: (2008) -
Distribution system design for residential (240v) and commercial (415v) /
by: 384678 Sharon Kaur Randhawa Harjit Singh
Published: (2000) -
An Alternate Representation of the Vector of Apparent Power and Unbalanced Power in Three-Phase Electrical Systems
by: Pedro A. Blasco, et al.
Published: (2020-05-01) -
Information sources in power engineering : a guide to energy resources and technology/
by: 450904 Metz, Karen S.
Published: (1975)