Two-Sided assembly line balancing to minimize number of workstation with considering the relationships between tasks

There are many problems in assembly line. Some of the problems are assembly line reliability which relates to maintenance and unbalance workload. As a result, production line is not efficient and production plan is not fulfilled. Previous research on two-sided assembly line balancing problem has pro...

Full description

Bibliographic Details
Main Authors: Rachmawaty Dina, Karningsih Putu Dana, Santosa Budi
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201820402015
_version_ 1818452657316036608
author Rachmawaty Dina
Karningsih Putu Dana
Santosa Budi
author_facet Rachmawaty Dina
Karningsih Putu Dana
Santosa Budi
author_sort Rachmawaty Dina
collection DOAJ
description There are many problems in assembly line. Some of the problems are assembly line reliability which relates to maintenance and unbalance workload. As a result, production line is not efficient and production plan is not fulfilled. Previous research on two-sided assembly line balancing problem has proprosed improvement method by considering index relationship between tasks. There are only two factors that is taken into account in this research, they are: distance factor of the implementation of the task (distance factor) and tools used to perform the task (tool factor). Therefore, this paper aims to develops conceptual model by considering additional factors that affecting Assembly Line Tasks Consistency (ATC). The additional factors that are considered are as follow: distance factor, tool factor, motion factor, layout factor, and skill factor. The purpose of this conceptual model is to increase productivity by minimizing number of workstations. Linear combination are used to find a combination solution of a relationship between task to complete a two-sided assembly line balancing problem. Improvement of proposed assembly line are measured according to Balance Delay (BD) and Line Efficiency (LE).
first_indexed 2024-12-14T21:26:34Z
format Article
id doaj.art-d455ab074a1b4aab92ad0fe0a7aa9439
institution Directory Open Access Journal
issn 2261-236X
language English
last_indexed 2024-12-14T21:26:34Z
publishDate 2018-01-01
publisher EDP Sciences
record_format Article
series MATEC Web of Conferences
spelling doaj.art-d455ab074a1b4aab92ad0fe0a7aa94392022-12-21T22:46:47ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-012040201510.1051/matecconf/201820402015matecconf_imiec2018_02015Two-Sided assembly line balancing to minimize number of workstation with considering the relationships between tasksRachmawaty DinaKarningsih Putu DanaSantosa BudiThere are many problems in assembly line. Some of the problems are assembly line reliability which relates to maintenance and unbalance workload. As a result, production line is not efficient and production plan is not fulfilled. Previous research on two-sided assembly line balancing problem has proprosed improvement method by considering index relationship between tasks. There are only two factors that is taken into account in this research, they are: distance factor of the implementation of the task (distance factor) and tools used to perform the task (tool factor). Therefore, this paper aims to develops conceptual model by considering additional factors that affecting Assembly Line Tasks Consistency (ATC). The additional factors that are considered are as follow: distance factor, tool factor, motion factor, layout factor, and skill factor. The purpose of this conceptual model is to increase productivity by minimizing number of workstations. Linear combination are used to find a combination solution of a relationship between task to complete a two-sided assembly line balancing problem. Improvement of proposed assembly line are measured according to Balance Delay (BD) and Line Efficiency (LE).https://doi.org/10.1051/matecconf/201820402015
spellingShingle Rachmawaty Dina
Karningsih Putu Dana
Santosa Budi
Two-Sided assembly line balancing to minimize number of workstation with considering the relationships between tasks
MATEC Web of Conferences
title Two-Sided assembly line balancing to minimize number of workstation with considering the relationships between tasks
title_full Two-Sided assembly line balancing to minimize number of workstation with considering the relationships between tasks
title_fullStr Two-Sided assembly line balancing to minimize number of workstation with considering the relationships between tasks
title_full_unstemmed Two-Sided assembly line balancing to minimize number of workstation with considering the relationships between tasks
title_short Two-Sided assembly line balancing to minimize number of workstation with considering the relationships between tasks
title_sort two sided assembly line balancing to minimize number of workstation with considering the relationships between tasks
url https://doi.org/10.1051/matecconf/201820402015
work_keys_str_mv AT rachmawatydina twosidedassemblylinebalancingtominimizenumberofworkstationwithconsideringtherelationshipsbetweentasks
AT karningsihputudana twosidedassemblylinebalancingtominimizenumberofworkstationwithconsideringtherelationshipsbetweentasks
AT santosabudi twosidedassemblylinebalancingtominimizenumberofworkstationwithconsideringtherelationshipsbetweentasks