Hydrodynamic model of the open-pit mine “Buvač” (Republic of Srpska)
Projecting of the dewatering system of the open-pit mine “Buvač” (Republic of Srpska, Bosnia and Herzegovina) is based on the use of hydrodynamic model of groundwater regime. Creating the hydrodynamic model of the open-pit mine “Buvač“ was made in phases, which began by basic interpretation of colle...
Main Authors: | Papić Petar, Bajić Dragoljub, Polomčić Dušan, Stojković Jana |
---|---|
Format: | Article |
Language: | English |
Published: |
SDEWES Centre
2013-09-01
|
Series: | Journal of Sustainable Development of Energy, Water and Environment Systems |
Subjects: | |
Online Access: | http://www.sdewes.org/jsdewes/pi2013.01.0019 |
Similar Items
-
Determining the Groundwater Balance and Radius of Influence Using Hydrodynamic Modeling: Case Study of the Groundwater Source “Šumice” in Serbia
by: Dušan Polomčić, et al.
Published: (2015-09-01) -
Estimating hydraulic parameters for the complex hydrodynamic models
by: Polomčić Dušan, et al.
Published: (2017-01-01) -
Study on the Roasting Process of Guisha Limonite Pellets
by: Chuang Zhang, et al.
Published: (2022-12-01) -
Hydrodynamic analysis of the interaction of two operating groundwater sources, case study: Groundwater supply of Bečej
by: Polomčić Dušan M., et al.
Published: (2014-01-01) -
Hydrodynamic model recalibration: Case study of the Drmno open cast coal mine
by: Polomčić Dušan M., et al.
Published: (2023-01-01)