Oil well casing cement flash setting problem causes and identification strategy based on cheese model

Abstract This paper deals with oil well cementing flash setting problem definition, interpretation and localization via PABM (phenomenon analysis-based method) and Swiss cheese model investigation. Cementing is the most critical job throughout the well realization process; it presents the face of th...

Full description

Bibliographic Details
Main Author: Abdeslem Leksir
Format: Article
Language:English
Published: SpringerOpen 2020-04-01
Series:Journal of Petroleum Exploration and Production Technology
Subjects:
Online Access:https://doi.org/10.1007/s13202-020-00882-9
_version_ 1811180320365477888
author Abdeslem Leksir
author_facet Abdeslem Leksir
author_sort Abdeslem Leksir
collection DOAJ
description Abstract This paper deals with oil well cementing flash setting problem definition, interpretation and localization via PABM (phenomenon analysis-based method) and Swiss cheese model investigation. Cementing is the most critical job throughout the well realization process; it presents the face of the well during production or abandonment. Within cement job some, problems come out and could lead to lose the well objectives, and it can be classified as cementing program’s awkward or operational hitches. This work is oriented toward operational stage, even if cement program and preparation seem in the rules of the art, the execution stage can interrupt the smooth running of cement job. Flash setting is one of the most critical problems that could be occurred, and it can be recognized by the prior increases in pressure to reach unpumpable stage. Identifying flash setting phenomenon and distinguishing them from other operational comportment stay hard task and present the heart of this work. Consequences could be varied from simple cement left inside casing to total free pipe of the annulus. PABM together with cheese model is proposed to be used for deep analysis of flash setting problems and points out the real causes, if they exist, rather than flash setting. The method proposed includes five steps, description of the operation, phenomenon, assumptions, cheese model and conclusion. The three first steps construct operation scrutiny, and the fourth step represents PABM. In this latter method, assumptions will pass through a selective process made from operation facts, and only the adequate assumption reaches the last layer of the model. Practical cases have been detailed to point out the merit of this method and distinguishing flash setting from other related cement problems.
first_indexed 2024-04-11T09:00:58Z
format Article
id doaj.art-d5ededfe2a40486b95255e77b553ad75
institution Directory Open Access Journal
issn 2190-0558
2190-0566
language English
last_indexed 2024-04-11T09:00:58Z
publishDate 2020-04-01
publisher SpringerOpen
record_format Article
series Journal of Petroleum Exploration and Production Technology
spelling doaj.art-d5ededfe2a40486b95255e77b553ad752022-12-22T04:32:47ZengSpringerOpenJournal of Petroleum Exploration and Production Technology2190-05582190-05662020-04-011083363337610.1007/s13202-020-00882-9Oil well casing cement flash setting problem causes and identification strategy based on cheese modelAbdeslem Leksir0SONATRACH, University of AnnabaAbstract This paper deals with oil well cementing flash setting problem definition, interpretation and localization via PABM (phenomenon analysis-based method) and Swiss cheese model investigation. Cementing is the most critical job throughout the well realization process; it presents the face of the well during production or abandonment. Within cement job some, problems come out and could lead to lose the well objectives, and it can be classified as cementing program’s awkward or operational hitches. This work is oriented toward operational stage, even if cement program and preparation seem in the rules of the art, the execution stage can interrupt the smooth running of cement job. Flash setting is one of the most critical problems that could be occurred, and it can be recognized by the prior increases in pressure to reach unpumpable stage. Identifying flash setting phenomenon and distinguishing them from other operational comportment stay hard task and present the heart of this work. Consequences could be varied from simple cement left inside casing to total free pipe of the annulus. PABM together with cheese model is proposed to be used for deep analysis of flash setting problems and points out the real causes, if they exist, rather than flash setting. The method proposed includes five steps, description of the operation, phenomenon, assumptions, cheese model and conclusion. The three first steps construct operation scrutiny, and the fourth step represents PABM. In this latter method, assumptions will pass through a selective process made from operation facts, and only the adequate assumption reaches the last layer of the model. Practical cases have been detailed to point out the merit of this method and distinguishing flash setting from other related cement problems.https://doi.org/10.1007/s13202-020-00882-9Well integrityCement flesh settingProblem investigationSwiss cheese model
spellingShingle Abdeslem Leksir
Oil well casing cement flash setting problem causes and identification strategy based on cheese model
Journal of Petroleum Exploration and Production Technology
Well integrity
Cement flesh setting
Problem investigation
Swiss cheese model
title Oil well casing cement flash setting problem causes and identification strategy based on cheese model
title_full Oil well casing cement flash setting problem causes and identification strategy based on cheese model
title_fullStr Oil well casing cement flash setting problem causes and identification strategy based on cheese model
title_full_unstemmed Oil well casing cement flash setting problem causes and identification strategy based on cheese model
title_short Oil well casing cement flash setting problem causes and identification strategy based on cheese model
title_sort oil well casing cement flash setting problem causes and identification strategy based on cheese model
topic Well integrity
Cement flesh setting
Problem investigation
Swiss cheese model
url https://doi.org/10.1007/s13202-020-00882-9
work_keys_str_mv AT abdeslemleksir oilwellcasingcementflashsettingproblemcausesandidentificationstrategybasedoncheesemodel