On Contribution of Construction Waste to Late Project Completion: An Approach based on Consensus Measurement among Construction Professionals
As an important indicator of poor project performance, late project completion is a result of delay. While delay itself is caused by numerous factors, their effects that eventually lead to late project completion are realized as waste in term of time. This research investigates how construction prof...
Main Author: | Mursadin Aqli |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://www.matec-conferences.org/articles/matecconf/pdf/2019/29/matecconf_icsbe2019_04018.pdf |
Similar Items
-
An application of statistical modelling on power generating asset performance analysis at the Asam-asam steam power plant of South Kalimantan
by: Mursadin Aqli
Published: (2018-01-01) -
THE POTENTIAL OF ACTIVATED CARBON FROM PEAT SOIL AS AN ABSORBENT FOR HYDROCARBON (HC) AND CARBON MONOXIDE (CO) EMISSIONS IN MOTOR VEHICLES
by: Abdul Ghofur, et al.
Published: (2022-06-01) -
The modelling of uncertainty factors towards project completion late delivery for piping construction /
by: Zirawani Baharum, 1980-, author, et al.
Published: (2017) -
The modelling of uncertainty factors towards project completion late delivery for piping construction /
by: Zirawani Baharum, 1980-, author
Published: (2017) -
Major factors contributing to the construction waste generation in building projects of Iraq
by: Khaleel Tareq, et al.
Published: (2018-01-01)