How to solve the technical problems in CBM development: A case study of a CBM gas reservoir in the southern Qinshui Basin
The low average single-well production, resulting in low economic benefit, has become the main bottleneck of CBM development in China. In view of this issue, through case study of a CBM gas reservoir in the southern Qinshui Basin, we summarized the present status of CBM technology and development th...
Main Authors: | Qingzhong Zhu, Yinqing Zuo, Yanhui Yang |
---|---|
Format: | Article |
Language: | English |
Published: |
KeAi Communications Co., Ltd.
2015-03-01
|
Series: | Natural Gas Industry B |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2352854015000509 |
Similar Items
-
Optimization of drilling system for CBM horizontal wells in Zhengzhuang Block of Qinshui Basin
by: Guishan LI, et al.
Published: (2023-04-01) -
Current status and key factors for coalbed methane development with multibranched horizontal wells in the southern Qinshui basin of China
by: Shida Chen, et al.
Published: (2019-10-01) -
A new attempt of a CBM tree-like horizontal well: A pilot case of Well ZS 1P-5H in the Qinshui Basin
by: Yong Yang, et al.
Published: (2014-12-01) -
Problems in the development of high-rank CBM horizontal wells in the Fanzhuang–Zhengzhuang Block in the Qinshui Basin and countermeasures
by: Yongping Zhang, et al.
Published: (2017-11-01) -
Key technology for treating slack coal blockage in CBM recovery: A case study from multi-lateral horizontal wells in the Qinshui Basin
by: Yong Yang, et al.
Published: (2016-01-01)