Practical aspects of field work carried out by Electrical Resistivity Tomography
The following article collects and describes several practical problems that can be encountered when performing geophysical field measurements using the electrical resistivity tomography (ERT) method. The methodology of work carried out with the Terrameter LS apparatus of the Swedish company ABEM (c...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Polish Academy of Sciences
2022-12-01
|
Series: | Archives of Civil Engineering |
Subjects: | |
Online Access: | https://journals.pan.pl/Content/125681/PDF/art19_int.pdf |
_version_ | 1797954404707467264 |
---|---|
author | Grzegorz Pacanowski Maciej Maślakowski Anna Lejzerowicz |
author_facet | Grzegorz Pacanowski Maciej Maślakowski Anna Lejzerowicz |
author_sort | Grzegorz Pacanowski |
collection | DOAJ |
description | The following article collects and describes several practical problems that can be encountered when performing geophysical field measurements using the electrical resistivity tomography (ERT) method. The methodology of work carried out with the Terrameter LS apparatus of the Swedish company ABEM (currently the company has changed its name to GUIDELINE GEO) was presented and discussed. The attention was paid to interesting solutions that increase the efficiency of works, especially in works related to linear investments. Errors that may appear during the use of the roll-along method are indicated, in particular, those appearing in measurements where too long measurement sections are transferred, as well as problems resulting from high electrode earthing, nonlinear profile traces and variable morphology. It describes how the use of different measurement systems affects the depth of prospecting, and which systems cope well in the area with disturbances. The article also emphasizes that the work should be properly planned before starting field research. |
first_indexed | 2024-04-10T23:18:06Z |
format | Article |
id | doaj.art-d6c379fb8af1465db7d5b2ff0afc0aa0 |
institution | Directory Open Access Journal |
issn | 1230-2945 |
language | English |
last_indexed | 2024-04-10T23:18:06Z |
publishDate | 2022-12-01 |
publisher | Polish Academy of Sciences |
record_format | Article |
series | Archives of Civil Engineering |
spelling | doaj.art-d6c379fb8af1465db7d5b2ff0afc0aa02023-01-12T18:06:08ZengPolish Academy of SciencesArchives of Civil Engineering1230-29452022-12-01vol. 68No 4331346https://doi.org/10.24425/ace.2022.143041Practical aspects of field work carried out by Electrical Resistivity TomographyGrzegorz Pacanowski0https://orcid.org/0000-0001-9045-3262Maciej Maślakowski1https://orcid.org/0000-0002-2946-1594Anna Lejzerowicz2https://orcid.org/0000-0002-1350-0632Polish Geological Institute – National Research Institute, Rakowiecka 4, 00-975 Warsaw, PolandWarsaw University of Technology, Faculty of Civil Engineering, Al. Armii Ludowej 16, 00-637 Warsaw, PolandWarsaw University of Technology, Faculty of Civil Engineering, Al. Armii Ludowej 16, 00-637 Warsaw, PolandThe following article collects and describes several practical problems that can be encountered when performing geophysical field measurements using the electrical resistivity tomography (ERT) method. The methodology of work carried out with the Terrameter LS apparatus of the Swedish company ABEM (currently the company has changed its name to GUIDELINE GEO) was presented and discussed. The attention was paid to interesting solutions that increase the efficiency of works, especially in works related to linear investments. Errors that may appear during the use of the roll-along method are indicated, in particular, those appearing in measurements where too long measurement sections are transferred, as well as problems resulting from high electrode earthing, nonlinear profile traces and variable morphology. It describes how the use of different measurement systems affects the depth of prospecting, and which systems cope well in the area with disturbances. The article also emphasizes that the work should be properly planned before starting field research.https://journals.pan.pl/Content/125681/PDF/art19_int.pdfabemelectrical resistivity tomographyertgeophysical field measurementsmeasurement systemsterrameter ls |
spellingShingle | Grzegorz Pacanowski Maciej Maślakowski Anna Lejzerowicz Practical aspects of field work carried out by Electrical Resistivity Tomography Archives of Civil Engineering abem electrical resistivity tomography ert geophysical field measurements measurement systems terrameter ls |
title | Practical aspects of field work carried out by Electrical Resistivity Tomography |
title_full | Practical aspects of field work carried out by Electrical Resistivity Tomography |
title_fullStr | Practical aspects of field work carried out by Electrical Resistivity Tomography |
title_full_unstemmed | Practical aspects of field work carried out by Electrical Resistivity Tomography |
title_short | Practical aspects of field work carried out by Electrical Resistivity Tomography |
title_sort | practical aspects of field work carried out by electrical resistivity tomography |
topic | abem electrical resistivity tomography ert geophysical field measurements measurement systems terrameter ls |
url | https://journals.pan.pl/Content/125681/PDF/art19_int.pdf |
work_keys_str_mv | AT grzegorzpacanowski practicalaspectsoffieldworkcarriedoutbyelectricalresistivitytomography AT maciejmaslakowski practicalaspectsoffieldworkcarriedoutbyelectricalresistivitytomography AT annalejzerowicz practicalaspectsoffieldworkcarriedoutbyelectricalresistivitytomography |