Kronologija izdelave digitalnega modela reliefa Slovenije : Chronology of Digital Terrain Model Production of Slovenia
In the paper, history of the digital terrain and elevation model (DTM and DEM) production is chronologically described. The first ideas to produce the DTM of Slovenia are from the late sixties of the previous century. In 1973 the production of the ‘DMR 100’ started, the project finished in 1984 and...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Association of Surveyors of Slovenia (Zveza geodetov Slovenije)
2003-01-01
|
Series: | Geodetski Vestnik |
Subjects: | |
Online Access: | http://www.geodetski-vestnik.com/47/12/gv47-1_047-054.pdf |
_version_ | 1818789088772227072 |
---|---|
author | Tomaž Podobnikar |
author_facet | Tomaž Podobnikar |
author_sort | Tomaž Podobnikar |
collection | DOAJ |
description | In the paper, history of the digital terrain and elevation model (DTM and DEM) production is chronologically described. The first ideas to produce the DTM of Slovenia are from the late sixties of the previous century. In 1973 the production of the ‘DMR 100’ started, the project finished in 1984 and was being updated until 1997. In 1975 the first digital terrain model for entire Slovenia was produced: ‘DMR 500’. Until the end of eighties and in the nineties there was no significant progress regarding DTM production. Since 1995 the ‘DMR 25’ has been produced as a lateral product of the digital orthophoto for scale 1:5000. In 2000 InSAR DMV 25 was produced with radar interferometry and in 2001 ‘DMV 20’ from geodetic data of various quality for 1/8 of Slovenia and vicinity. |
first_indexed | 2024-12-18T14:34:00Z |
format | Article |
id | doaj.art-d70e8fa00148444d9d0d57f0df39a07c |
institution | Directory Open Access Journal |
issn | 0351-0271 |
language | English |
last_indexed | 2024-12-18T14:34:00Z |
publishDate | 2003-01-01 |
publisher | Association of Surveyors of Slovenia (Zveza geodetov Slovenije) |
record_format | Article |
series | Geodetski Vestnik |
spelling | doaj.art-d70e8fa00148444d9d0d57f0df39a07c2022-12-21T21:04:32ZengAssociation of Surveyors of Slovenia (Zveza geodetov Slovenije)Geodetski Vestnik0351-02712003-01-01471-24754Kronologija izdelave digitalnega modela reliefa Slovenije : Chronology of Digital Terrain Model Production of SloveniaTomaž PodobnikarIn the paper, history of the digital terrain and elevation model (DTM and DEM) production is chronologically described. The first ideas to produce the DTM of Slovenia are from the late sixties of the previous century. In 1973 the production of the ‘DMR 100’ started, the project finished in 1984 and was being updated until 1997. In 1975 the first digital terrain model for entire Slovenia was produced: ‘DMR 500’. Until the end of eighties and in the nineties there was no significant progress regarding DTM production. Since 1995 the ‘DMR 25’ has been produced as a lateral product of the digital orthophoto for scale 1:5000. In 2000 InSAR DMV 25 was produced with radar interferometry and in 2001 ‘DMV 20’ from geodetic data of various quality for 1/8 of Slovenia and vicinity.http://www.geodetski-vestnik.com/47/12/gv47-1_047-054.pdfdigitalni model reliefadigitalni model višinDMRDMVzgodovinageodetski podatkidigital terrain modeldigital elevation modelDTMDEMhistorygeodetic data |
spellingShingle | Tomaž Podobnikar Kronologija izdelave digitalnega modela reliefa Slovenije : Chronology of Digital Terrain Model Production of Slovenia Geodetski Vestnik digitalni model reliefa digitalni model višin DMR DMV zgodovina geodetski podatki digital terrain model digital elevation model DTM DEM history geodetic data |
title | Kronologija izdelave digitalnega modela reliefa Slovenije : Chronology of Digital Terrain Model Production of Slovenia |
title_full | Kronologija izdelave digitalnega modela reliefa Slovenije : Chronology of Digital Terrain Model Production of Slovenia |
title_fullStr | Kronologija izdelave digitalnega modela reliefa Slovenije : Chronology of Digital Terrain Model Production of Slovenia |
title_full_unstemmed | Kronologija izdelave digitalnega modela reliefa Slovenije : Chronology of Digital Terrain Model Production of Slovenia |
title_short | Kronologija izdelave digitalnega modela reliefa Slovenije : Chronology of Digital Terrain Model Production of Slovenia |
title_sort | kronologija izdelave digitalnega modela reliefa slovenije chronology of digital terrain model production of slovenia |
topic | digitalni model reliefa digitalni model višin DMR DMV zgodovina geodetski podatki digital terrain model digital elevation model DTM DEM history geodetic data |
url | http://www.geodetski-vestnik.com/47/12/gv47-1_047-054.pdf |
work_keys_str_mv | AT tomazpodobnikar kronologijaizdelavedigitalnegamodelareliefaslovenijechronologyofdigitalterrainmodelproductionofslovenia |