Manufacturing 4.0 Operations Scheduling with AGV Battery Management Constraints
The industry 4.0 concepts are moving towards flexible and energy efficient factories. Major flexible production lines use battery-based automated guided vehicles (AGVs) to optimize their handling processes. However, optimal AGV battery management can significantly shorten lead times. In this paper,...
Main Authors: | Moussa Abderrahim, Abdelghani Bekrar, Damien Trentesaux, Nassima Aissani, Karim Bouamrane |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2020-09-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/13/18/4948 |
Similar Items
-
Constraint programing for solving four complex flexible shop scheduling problems
by: Leilei Meng, et al.
Published: (2021-06-01) -
Mathematical Programming vs. Constraint Programming for Scheduling Problems
by: Ludmila Janosikova, et al.
Published: (2013-03-01) -
An Improved Genetic Algorithm for Solving the Multi-AGV Flexible Job Shop Scheduling Problem
by: Leilei Meng, et al.
Published: (2023-04-01) -
Energy-Saving Scheduling for Flexible Job Shop Problem with AGV Transportation Considering Emergencies
by: Hongliang Zhang, et al.
Published: (2023-02-01) -
A Constraint Programming Formulation of the Multi-Mode Resource-Constrained Project Scheduling Problem for the Flexible Job Shop Scheduling Problem
by: Francisco Yuraszeck, et al.
Published: (2023-01-01)