Summary: | According to the problem of deformation of surrounding rock when the double-wall method is adopted in the tunnel, the five tunnel monitoring points are set in the tunnel vault, arch waist and arch foot to simulate the tunnel excavation process. The surrounding rock is deformed, and the excavation of the middle guide hole makes the deformation of the surrounding rock reach 7.2mm. After the removal of the middle partition wall, the deformation reaches the maximum, which is 8.4mm. The horizontal displacement starts to increase rapidly, and the maximum is 5.3mm. According to the analysis results, the surrounding rock above the tunnel should be reinforced in time, and the deformation of the surrounding rock after the removal of the middle partition wall should be paid attention to ensure the construction safety and provide reference for future construction.
|