Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints
Abstract In this paper, we focus on outsourcing activities optimization problem in single period setting. In some situations, capacity planning or outsourcing is a one-time event and can be modeled as a single period problem. The aim of this research is to balance the trade-off between two echelons...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Islamic Azad University
2019-03-01
|
Series: | Journal of Industrial Engineering International |
Subjects: | |
Online Access: | http://link.springer.com/article/10.1007/s40092-019-0307-9 |
_version_ | 1818615431014907904 |
---|---|
author | Mohammed Haoues Mohammed Dahane Nadia Kinza Mouss |
author_facet | Mohammed Haoues Mohammed Dahane Nadia Kinza Mouss |
author_sort | Mohammed Haoues |
collection | DOAJ |
description | Abstract In this paper, we focus on outsourcing activities optimization problem in single period setting. In some situations, capacity planning or outsourcing is a one-time event and can be modeled as a single period problem. The aim of this research is to balance the trade-off between two echelons of a supply chain consisting of a single outsourcer and a single subcontractor. Each part is composed of a failure-prone single machine that produces one product type to satisfy market requirements. The outsourcer’s manufacturing system is not able to satisfy the demand; in this case, outsourcing is allowed to recover the lack of capacity. We consider that the subcontractor can satisfy the demands of strategic clients and rent his machine for the outsourcer under a win–win partnership contract. We assume that the hazard failure rate depends on time and the adopted manufacture rate. When unforeseen failures occur, minimal repairs are implemented. Overhaul can be performed to reduce the degradation effects. Hence, we develop a mathematical model to define a profitability interval so that both parties of supply chain can be considered as winners. We seek to determine the contract parameters that suit both parties (duration, start and end dates, the production and outsourcing rates). Then, we develop an exact algorithm to solve the problem of single period optimization, which offers a better execution time through a series of test problems. Finally, we consider a sensitivity analysis based on outsourcing parameters (cost, periodicities, etc) to analyze their effects on partial costs and individual profit of each part, as well as the total profit generated by the system. |
first_indexed | 2024-12-16T16:33:47Z |
format | Article |
id | doaj.art-d7d9484b795a4782a7a5becf3f21e08e |
institution | Directory Open Access Journal |
issn | 1735-5702 2251-712X |
language | English |
last_indexed | 2024-12-16T16:33:47Z |
publishDate | 2019-03-01 |
publisher | Islamic Azad University |
record_format | Article |
series | Journal of Industrial Engineering International |
spelling | doaj.art-d7d9484b795a4782a7a5becf3f21e08e2022-12-21T22:24:31ZengIslamic Azad UniversityJournal of Industrial Engineering International1735-57022251-712X2019-03-0115339540910.1007/s40092-019-0307-9Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraintsMohammed Haoues0Mohammed Dahane1Nadia Kinza Mouss2Laboratory of Automatic and Manufacturing, Industrial Engineering Department, Batna 2 UniversityUniversité de Lorraine, LGIPMLaboratory of Automatic and Manufacturing, Industrial Engineering Department, Batna 2 UniversityAbstract In this paper, we focus on outsourcing activities optimization problem in single period setting. In some situations, capacity planning or outsourcing is a one-time event and can be modeled as a single period problem. The aim of this research is to balance the trade-off between two echelons of a supply chain consisting of a single outsourcer and a single subcontractor. Each part is composed of a failure-prone single machine that produces one product type to satisfy market requirements. The outsourcer’s manufacturing system is not able to satisfy the demand; in this case, outsourcing is allowed to recover the lack of capacity. We consider that the subcontractor can satisfy the demands of strategic clients and rent his machine for the outsourcer under a win–win partnership contract. We assume that the hazard failure rate depends on time and the adopted manufacture rate. When unforeseen failures occur, minimal repairs are implemented. Overhaul can be performed to reduce the degradation effects. Hence, we develop a mathematical model to define a profitability interval so that both parties of supply chain can be considered as winners. We seek to determine the contract parameters that suit both parties (duration, start and end dates, the production and outsourcing rates). Then, we develop an exact algorithm to solve the problem of single period optimization, which offers a better execution time through a series of test problems. Finally, we consider a sensitivity analysis based on outsourcing parameters (cost, periodicities, etc) to analyze their effects on partial costs and individual profit of each part, as well as the total profit generated by the system.http://link.springer.com/article/10.1007/s40092-019-0307-9Outsourcing optimizationProduction controlReliabilityRelationship outsourcer–subcontractorExhaustive search |
spellingShingle | Mohammed Haoues Mohammed Dahane Nadia Kinza Mouss Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints Journal of Industrial Engineering International Outsourcing optimization Production control Reliability Relationship outsourcer–subcontractor Exhaustive search |
title | Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints |
title_full | Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints |
title_fullStr | Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints |
title_full_unstemmed | Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints |
title_short | Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints |
title_sort | optimization of single outsourcer single subcontractor outsourcing relationship under reliability and maintenance constraints |
topic | Outsourcing optimization Production control Reliability Relationship outsourcer–subcontractor Exhaustive search |
url | http://link.springer.com/article/10.1007/s40092-019-0307-9 |
work_keys_str_mv | AT mohammedhaoues optimizationofsingleoutsourcersinglesubcontractoroutsourcingrelationshipunderreliabilityandmaintenanceconstraints AT mohammeddahane optimizationofsingleoutsourcersinglesubcontractoroutsourcingrelationshipunderreliabilityandmaintenanceconstraints AT nadiakinzamouss optimizationofsingleoutsourcersinglesubcontractoroutsourcingrelationshipunderreliabilityandmaintenanceconstraints |