Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints

Abstract In this paper, we focus on outsourcing activities optimization problem in single period setting. In some situations, capacity planning or outsourcing is a one-time event and can be modeled as a single period problem. The aim of this research is to balance the trade-off between two echelons...

Full description

Bibliographic Details
Main Authors: Mohammed Haoues, Mohammed Dahane, Nadia Kinza Mouss
Format: Article
Language:English
Published: Islamic Azad University 2019-03-01
Series:Journal of Industrial Engineering International
Subjects:
Online Access:http://link.springer.com/article/10.1007/s40092-019-0307-9
_version_ 1818615431014907904
author Mohammed Haoues
Mohammed Dahane
Nadia Kinza Mouss
author_facet Mohammed Haoues
Mohammed Dahane
Nadia Kinza Mouss
author_sort Mohammed Haoues
collection DOAJ
description Abstract In this paper, we focus on outsourcing activities optimization problem in single period setting. In some situations, capacity planning or outsourcing is a one-time event and can be modeled as a single period problem. The aim of this research is to balance the trade-off between two echelons of a supply chain consisting of a single outsourcer and a single subcontractor. Each part is composed of a failure-prone single machine that produces one product type to satisfy market requirements. The outsourcer’s manufacturing system is not able to satisfy the demand; in this case, outsourcing is allowed to recover the lack of capacity. We consider that the subcontractor can satisfy the demands of strategic clients and rent his machine for the outsourcer under a win–win partnership contract. We assume that the hazard failure rate depends on time and the adopted manufacture rate. When unforeseen failures occur, minimal repairs are implemented. Overhaul can be performed to reduce the degradation effects. Hence, we develop a mathematical model to define a profitability interval so that both parties of supply chain can be considered as winners. We seek to determine the contract parameters that suit both parties (duration, start and end dates, the production and outsourcing rates). Then, we develop an exact algorithm to solve the problem of single period optimization, which offers a better execution time through a series of test problems. Finally, we consider a sensitivity analysis based on outsourcing parameters (cost, periodicities, etc) to analyze their effects on partial costs and individual profit of each part, as well as the total profit generated by the system.
first_indexed 2024-12-16T16:33:47Z
format Article
id doaj.art-d7d9484b795a4782a7a5becf3f21e08e
institution Directory Open Access Journal
issn 1735-5702
2251-712X
language English
last_indexed 2024-12-16T16:33:47Z
publishDate 2019-03-01
publisher Islamic Azad University
record_format Article
series Journal of Industrial Engineering International
spelling doaj.art-d7d9484b795a4782a7a5becf3f21e08e2022-12-21T22:24:31ZengIslamic Azad UniversityJournal of Industrial Engineering International1735-57022251-712X2019-03-0115339540910.1007/s40092-019-0307-9Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraintsMohammed Haoues0Mohammed Dahane1Nadia Kinza Mouss2Laboratory of Automatic and Manufacturing, Industrial Engineering Department, Batna 2 UniversityUniversité de Lorraine, LGIPMLaboratory of Automatic and Manufacturing, Industrial Engineering Department, Batna 2 UniversityAbstract In this paper, we focus on outsourcing activities optimization problem in single period setting. In some situations, capacity planning or outsourcing is a one-time event and can be modeled as a single period problem. The aim of this research is to balance the trade-off between two echelons of a supply chain consisting of a single outsourcer and a single subcontractor. Each part is composed of a failure-prone single machine that produces one product type to satisfy market requirements. The outsourcer’s manufacturing system is not able to satisfy the demand; in this case, outsourcing is allowed to recover the lack of capacity. We consider that the subcontractor can satisfy the demands of strategic clients and rent his machine for the outsourcer under a win–win partnership contract. We assume that the hazard failure rate depends on time and the adopted manufacture rate. When unforeseen failures occur, minimal repairs are implemented. Overhaul can be performed to reduce the degradation effects. Hence, we develop a mathematical model to define a profitability interval so that both parties of supply chain can be considered as winners. We seek to determine the contract parameters that suit both parties (duration, start and end dates, the production and outsourcing rates). Then, we develop an exact algorithm to solve the problem of single period optimization, which offers a better execution time through a series of test problems. Finally, we consider a sensitivity analysis based on outsourcing parameters (cost, periodicities, etc) to analyze their effects on partial costs and individual profit of each part, as well as the total profit generated by the system.http://link.springer.com/article/10.1007/s40092-019-0307-9Outsourcing optimizationProduction controlReliabilityRelationship outsourcer–subcontractorExhaustive search
spellingShingle Mohammed Haoues
Mohammed Dahane
Nadia Kinza Mouss
Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints
Journal of Industrial Engineering International
Outsourcing optimization
Production control
Reliability
Relationship outsourcer–subcontractor
Exhaustive search
title Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints
title_full Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints
title_fullStr Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints
title_full_unstemmed Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints
title_short Optimization of single outsourcer–single subcontractor outsourcing relationship under reliability and maintenance constraints
title_sort optimization of single outsourcer single subcontractor outsourcing relationship under reliability and maintenance constraints
topic Outsourcing optimization
Production control
Reliability
Relationship outsourcer–subcontractor
Exhaustive search
url http://link.springer.com/article/10.1007/s40092-019-0307-9
work_keys_str_mv AT mohammedhaoues optimizationofsingleoutsourcersinglesubcontractoroutsourcingrelationshipunderreliabilityandmaintenanceconstraints
AT mohammeddahane optimizationofsingleoutsourcersinglesubcontractoroutsourcingrelationshipunderreliabilityandmaintenanceconstraints
AT nadiakinzamouss optimizationofsingleoutsourcersinglesubcontractoroutsourcingrelationshipunderreliabilityandmaintenanceconstraints