CO<sub>2</sub> Total Site Planning with Centralised Multiple Headers

CO2 Capture, Utilisation and Storage (CCUS) has been gearing towards the technology viable for CO2 removal from the atmosphere. The successful implementation of an integrated CCUS system would open up the opportunity to develop high CO2 gas field as well ensures the sustainability of gas production...

Full description

Bibliographic Details
Main Authors: Jeffelee Sanghuang, Sharifah Rafidah Wan Alwi, Wan Norlinda Roshana Mohd Nawi, Zainuddin Abdul Manan, Jiri Jaromir Klemes
Format: Article
Language:English
Published: AIDIC Servizi S.r.l. 2019-10-01
Series:Chemical Engineering Transactions
Online Access:https://www.cetjournal.it/index.php/cet/article/view/10475
_version_ 1818393978760855552
author Jeffelee Sanghuang
Sharifah Rafidah Wan Alwi
Wan Norlinda Roshana Mohd Nawi
Zainuddin Abdul Manan
Jiri Jaromir Klemes
author_facet Jeffelee Sanghuang
Sharifah Rafidah Wan Alwi
Wan Norlinda Roshana Mohd Nawi
Zainuddin Abdul Manan
Jiri Jaromir Klemes
author_sort Jeffelee Sanghuang
collection DOAJ
description CO2 Capture, Utilisation and Storage (CCUS) has been gearing towards the technology viable for CO2 removal from the atmosphere. The successful implementation of an integrated CCUS system would open up the opportunity to develop high CO2 gas field as well ensures the sustainability of gas production while minimising the impact on the environment. A methodology of CO2 integration management by maximising the recovery of CO2 for future utilisation and minimising CO2 to be sent for sequestration through centralised CO2 headers or known as CO2 Total Site has been developed. It consists of one high-purity header that is attached to CO2 storage or reservoir and low-purity headers that accept CO2 sources at different purity to satisfy CO2 demands. The multiple headers with consideration of different purity range of headers and a different number of headers are studied in this work. The application of the CO2 Total Site-Problem Table Analysis (CTS-PTA) has potentially resulted in an optimal CO2 target with the reduction of carbon storage of 32 % with a lower risk of CO2 leakage and low CO2 emission.
first_indexed 2024-12-14T05:53:54Z
format Article
id doaj.art-d8247a8865ba41c6b287e53d96c60b11
institution Directory Open Access Journal
issn 2283-9216
language English
last_indexed 2024-12-14T05:53:54Z
publishDate 2019-10-01
publisher AIDIC Servizi S.r.l.
record_format Article
series Chemical Engineering Transactions
spelling doaj.art-d8247a8865ba41c6b287e53d96c60b112022-12-21T23:14:38ZengAIDIC Servizi S.r.l.Chemical Engineering Transactions2283-92162019-10-017610.3303/CET1976024CO<sub>2</sub> Total Site Planning with Centralised Multiple HeadersJeffelee SanghuangSharifah Rafidah Wan AlwiWan Norlinda Roshana Mohd NawiZainuddin Abdul MananJiri Jaromir KlemesCO2 Capture, Utilisation and Storage (CCUS) has been gearing towards the technology viable for CO2 removal from the atmosphere. The successful implementation of an integrated CCUS system would open up the opportunity to develop high CO2 gas field as well ensures the sustainability of gas production while minimising the impact on the environment. A methodology of CO2 integration management by maximising the recovery of CO2 for future utilisation and minimising CO2 to be sent for sequestration through centralised CO2 headers or known as CO2 Total Site has been developed. It consists of one high-purity header that is attached to CO2 storage or reservoir and low-purity headers that accept CO2 sources at different purity to satisfy CO2 demands. The multiple headers with consideration of different purity range of headers and a different number of headers are studied in this work. The application of the CO2 Total Site-Problem Table Analysis (CTS-PTA) has potentially resulted in an optimal CO2 target with the reduction of carbon storage of 32 % with a lower risk of CO2 leakage and low CO2 emission.https://www.cetjournal.it/index.php/cet/article/view/10475
spellingShingle Jeffelee Sanghuang
Sharifah Rafidah Wan Alwi
Wan Norlinda Roshana Mohd Nawi
Zainuddin Abdul Manan
Jiri Jaromir Klemes
CO<sub>2</sub> Total Site Planning with Centralised Multiple Headers
Chemical Engineering Transactions
title CO<sub>2</sub> Total Site Planning with Centralised Multiple Headers
title_full CO<sub>2</sub> Total Site Planning with Centralised Multiple Headers
title_fullStr CO<sub>2</sub> Total Site Planning with Centralised Multiple Headers
title_full_unstemmed CO<sub>2</sub> Total Site Planning with Centralised Multiple Headers
title_short CO<sub>2</sub> Total Site Planning with Centralised Multiple Headers
title_sort co sub 2 sub total site planning with centralised multiple headers
url https://www.cetjournal.it/index.php/cet/article/view/10475
work_keys_str_mv AT jeffeleesanghuang cosub2subtotalsiteplanningwithcentralisedmultipleheaders
AT sharifahrafidahwanalwi cosub2subtotalsiteplanningwithcentralisedmultipleheaders
AT wannorlindaroshanamohdnawi cosub2subtotalsiteplanningwithcentralisedmultipleheaders
AT zainuddinabdulmanan cosub2subtotalsiteplanningwithcentralisedmultipleheaders
AT jirijaromirklemes cosub2subtotalsiteplanningwithcentralisedmultipleheaders