A New Algorithm of Automatic Generation of Double-line Laneway Based on Centerline
In view of problems existed in current algorithm of automatic generation of double-line laneway, the paper proposed a new algorithm of automatic generation of double-line laneway based on centerline. The principle of the algorithm is as follows: offsetting 1/2 of laneway width from laneway centerlin...
Main Author: | WANG Dong-rui |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Industry and Mine Automation
2011-03-01
|
Series: | Gong-kuang zidonghua |
Subjects: | |
Online Access: | http://www.gkzdh.cn/article/id/2700 |
Similar Items
-
Mitigation of phosphorus, sediment and Escherichia coli losses in runoff from a dairy farm roadway
by: R.W. McDowell, et al.
Published: (2020-11-01) -
3D Modeling Method of Mine Laneway Based on Multipath
by: YANG Fan, et al.
Published: (2012-12-01) -
Analysis of Causes of Transportation Accidents in Underground Mine Laneway
by: YUAN Hu-jun, et al.
Published: (2011-05-01) -
Assessment of the current performance of grazing infrastructure across Irish dairy farms
by: P.J. Maher, et al.
Published: (2023-07-01) -
Design of a Novel Electrical Control System for Boom-type Roadheader Based on Power Panel and PCC
by: GAO Juan, et al.
Published: (2011-04-01)