Modification of the Peck Formula for a Double-Track Shield Tunnel under Expressway Subgrade
In practice, asymmetric formation disturbance occurs due to the sequence of excavation though parallel double-track tunnel is a typical symmetrical engineering. Based on a shield tunneling project of a section of the Suzhou Rail Transit under the subgrade of the Shanghai–Nanjing Expressway, a finite...
Main Authors: | Yuxiang Li, Juncen Lin, Songhong Yan, Jiaxuan Du |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2022-09-01
|
Series: | Symmetry |
Subjects: | |
Online Access: | https://www.mdpi.com/2073-8994/14/9/1904 |
Similar Items
-
Study on Railway Subgrade Settlement induced by an Ultra-Large-Diameter Shield Tunnel Crossing under Railway Subgrade
by: Ming Song, et al.
Published: (2022-12-01) -
Prediction for the surface settlement of double-track subway tunnels for shallow buried loess based on peck formula
by: Shuangyuan Wang, et al.
Published: (2023-06-01) -
Theoretical Analysis on the Effectiveness of Pipe Roofs in Shallow Tunnels
by: Yuxiang Li, et al.
Published: (2022-09-01) -
Numerical study on transverse deformation characteristics of shield tunnel subject to local soil loosening
by: Dong Su, et al.
Published: (2022-02-01) -
Observed Environment Response Caused by Construction of Double-Line Parallel Pipe Jacking Crossing over Metro Shield Tunnels
by: YING Hongwei, YAO Yan, WANG Kuihua, ZHANG Changju
Published: (2023-12-01)