Modification of the Peck Formula for a Double-Track Shield Tunnel under Expressway Subgrade

In practice, asymmetric formation disturbance occurs due to the sequence of excavation though parallel double-track tunnel is a typical symmetrical engineering. Based on a shield tunneling project of a section of the Suzhou Rail Transit under the subgrade of the Shanghai–Nanjing Expressway, a finite...

Full description

Bibliographic Details
Main Authors: Yuxiang Li, Juncen Lin, Songhong Yan, Jiaxuan Du
Format: Article
Language:English
Published: MDPI AG 2022-09-01
Series:Symmetry
Subjects:
Online Access:https://www.mdpi.com/2073-8994/14/9/1904

Similar Items