Fabrication runtime decision for a hybrid system incorporating probabilistic breakdowns, scrap, and overtime
Manufacturers today need to optimize their fabrication runtime decision by meeting short customer order due dates externally and managing the potentially unreliable machines and manufacturing processes internally. Outsourcing and overtime are commonly utilized strategies to expedite fabrica...
Main Authors: | Yuan-Shyi Peter Chiu, Yunsen Wang, Tsu-Ming Yeh, Singa Wang Chiu |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2022-01-01
|
Series: | International Journal of Industrial Engineering Computations |
Online Access: | http://www.growingscience.com/ijiec/Vol13/IJIEC_2022_10.pdf |
Similar Items
-
Manufacturing runtime problem with an expedited fabrication rate, random failures, and scrap
by: Singa Wang Chiu, et al.
Published: (2020-01-01) -
An operating cost minimization model for buyer-vendor coordination batch system with breakdowns, scrap, overtime, and an external source
by: Yuan-Shyi P. Chiu, et al.
Published: (2024-01-01) -
Studying the effect of stochastic breakdowns, overtime, and rework on inventory replenishment decision
by: Yuan-Shyi Peter Chiu, et al.
Published: (2021-02-01) -
Minimizing operating expenditures for a manufacturing system featuring quality reassurances, probabilistic failures, overtime, and outsourcing
by: Yuan-Shyi Peter Chiu, et al.
Published: (2023-01-01) -
A postponement model for multi-item replenishment decision considering overtime, commonality, and quality reassurance
by: Yuan-Shyi Peter Chiu, et al.
Published: (2020-06-01)