Labor demand as a key factor in building process planning
Man or machine hours needed by various resources to complete construction works are the basis for work estimation and scheduling. In particular, they enable the planner to estimate labor costs or time needed to complete the task, review the resource of workload and availability of resources assigned...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Lublin University of Technology
2013-03-01
|
Series: | Budownictwo i Architektura |
Subjects: | |
Online Access: | https://ph.pollub.pl/index.php/bia/article/view/2163 |
_version_ | 1797286916514643968 |
---|---|
author | Roman Marcinkowski |
author_facet | Roman Marcinkowski |
author_sort | Roman Marcinkowski |
collection | DOAJ |
description | Man or machine hours needed by various resources to complete construction works are the basis for work estimation and scheduling. In particular, they enable the planner to estimate labor costs or time needed to complete the task, review the resource of workload and availability of resources assigned to particular task, check the possibility of sharing resources across various tasks and determine other rates and factors useful in works scheduling. The project schedule can be analyzed both without or with and in consideration of risk of the end date of the project being pushed out or going over budget on the project. Issues presented above are the subject of this paper. The methods of solving described problems consider the optimization of a loss that derives from partial utilization of assigned the resources. |
first_indexed | 2024-03-07T18:25:16Z |
format | Article |
id | doaj.art-dace1c07ad6d4144ae82979867c708ed |
institution | Directory Open Access Journal |
issn | 1899-0665 2544-3275 |
language | English |
last_indexed | 2024-03-07T18:25:16Z |
publishDate | 2013-03-01 |
publisher | Lublin University of Technology |
record_format | Article |
series | Budownictwo i Architektura |
spelling | doaj.art-dace1c07ad6d4144ae82979867c708ed2024-03-02T07:05:05ZengLublin University of TechnologyBudownictwo i Architektura1899-06652544-32752013-03-0112110.35784/bud-arch.2163Labor demand as a key factor in building process planningRoman Marcinkowski0Faculty of Civil Engineering, Mechanics and Petrochemistry, Warsaw University of TechnologyMan or machine hours needed by various resources to complete construction works are the basis for work estimation and scheduling. In particular, they enable the planner to estimate labor costs or time needed to complete the task, review the resource of workload and availability of resources assigned to particular task, check the possibility of sharing resources across various tasks and determine other rates and factors useful in works scheduling. The project schedule can be analyzed both without or with and in consideration of risk of the end date of the project being pushed out or going over budget on the project. Issues presented above are the subject of this paper. The methods of solving described problems consider the optimization of a loss that derives from partial utilization of assigned the resources.https://ph.pollub.pl/index.php/bia/article/view/2163building process planningtotal labor demandlabor productivitytime of building task performance |
spellingShingle | Roman Marcinkowski Labor demand as a key factor in building process planning Budownictwo i Architektura building process planning total labor demand labor productivity time of building task performance |
title | Labor demand as a key factor in building process planning |
title_full | Labor demand as a key factor in building process planning |
title_fullStr | Labor demand as a key factor in building process planning |
title_full_unstemmed | Labor demand as a key factor in building process planning |
title_short | Labor demand as a key factor in building process planning |
title_sort | labor demand as a key factor in building process planning |
topic | building process planning total labor demand labor productivity time of building task performance |
url | https://ph.pollub.pl/index.php/bia/article/view/2163 |
work_keys_str_mv | AT romanmarcinkowski labordemandasakeyfactorinbuildingprocessplanning |