Testing a system for monitoring the operation of hydraulic complexes at hydromechanized mines
Background. An analysis of the process of hydraulic mining at mines found the absence or irregularity of monitoring of the main parameters of slurry transportation. These parameters include the flow rate and density of the slurry, which determine the hourly output in terms of the rock mass delivered...
Hauptverfasser: | V. Р. Drobadenko, А. L. Vilmis, О. А. Lukonina, К. S. Nekoz, I. N. Salakhov |
---|---|
Format: | Artikel |
Sprache: | Russian |
Veröffentlicht: |
Sergo Ordzhonikidze Russian State University for Geological Prospecting
2024-05-01
|
Schriftenreihe: | Известия высших учебных заведений: Геология и разведка |
Schlagworte: | |
Online Zugang: | https://www.geology-mgri.ru/jour/article/view/1011 |
Ähnliche Einträge
Ähnliche Einträge
-
A Pressure-Based Multiphase Flowmeter: Proof of Concept
von: Vijay Ramakrishnan, et al.
Veröffentlicht: (2023-08-01) -
Numerical analysis of the venturi flowmeter in the liquid lead-bismuth eutectic circuit after long-term operation
von: Zhichao Zhang, et al.
Veröffentlicht: (2024-03-01) -
Impeller flowmeters as a tool for assessing blood flow in an experimental test bench
von: Dol, Aleksandr Viktorovich, et al.
Veröffentlicht: (2022-11-01) -
Studies on Venturi Scrubber Performance and Efficiency - A Review
von: M. Avinasilingam, et al.
Veröffentlicht: (2022-03-01) -
A Simple and Effective Method for Measuring the Density of Non-Newtonian Thickened Tailings Slurry during Hydraulic Transport
von: Maciej Filip Gruszczyński, et al.
Veröffentlicht: (2022-10-01)