Testing a system for monitoring the operation of hydraulic complexes at hydromechanized mines
Background. An analysis of the process of hydraulic mining at mines found the absence or irregularity of monitoring of the main parameters of slurry transportation. These parameters include the flow rate and density of the slurry, which determine the hourly output in terms of the rock mass delivered...
Principais autores: | V. Р. Drobadenko, А. L. Vilmis, О. А. Lukonina, К. S. Nekoz, I. N. Salakhov |
---|---|
Formato: | Artigo |
Idioma: | Russian |
Publicado em: |
Sergo Ordzhonikidze Russian State University for Geological Prospecting
2024-05-01
|
coleção: | Известия высших учебных заведений: Геология и разведка |
Assuntos: | |
Acesso em linha: | https://www.geology-mgri.ru/jour/article/view/1011 |
Registros relacionados
-
A Pressure-Based Multiphase Flowmeter: Proof of Concept
por: Vijay Ramakrishnan, et al.
Publicado em: (2023-08-01) -
Numerical analysis of the venturi flowmeter in the liquid lead-bismuth eutectic circuit after long-term operation
por: Zhichao Zhang, et al.
Publicado em: (2024-03-01) -
Impeller flowmeters as a tool for assessing blood flow in an experimental test bench
por: Dol, Aleksandr Viktorovich, et al.
Publicado em: (2022-11-01) -
Studies on Venturi Scrubber Performance and Efficiency - A Review
por: M. Avinasilingam, et al.
Publicado em: (2022-03-01) -
A Simple and Effective Method for Measuring the Density of Non-Newtonian Thickened Tailings Slurry during Hydraulic Transport
por: Maciej Filip Gruszczyński, et al.
Publicado em: (2022-10-01)