CONSTRUCTION OF NEW MULTI-FUNCTION TYPE ARTIFICIAL BOUNDARY PILLAR FOR TRANSITION FROM OPEN PIT TO UNDERGROUND MINING
In allusion to the defects of large material consumption and high construction cost of conventional artificial boundary pillar for the transition from open pit to underground mining, a new multi-function type of artificial boundary pillar scheme of reinforced concrete is proposed, which creates favo...
Main Authors: | Honggang Ren, Zhuoying Tan, Panxue Feng |
---|---|
Format: | Article |
Language: | English |
Published: |
Czech Technical University, Prague
2019-04-01
|
Series: | Civil Engineering Journal |
Subjects: | |
Online Access: | http://www.civilengineeringjournal.cz/archive/issues/2019/2019_1/CEJ-1-2019-0008-(89-102).pdf |
Similar Items
-
Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining
by: Rafiq Sulistyo, et al.
Published: (2011-04-01) -
Operations Strategy Formulation: Shifting from Grasberg Open-Pit Surface Mining to Underground Mining
by: Rafiq Sulistyo, et al.
Published: (2011-04-01) -
Stability analysis of rib pillars in highwall mining under dynamic and static loads in open-pit coal mine
by: Haoshuai Wu, et al.
Published: (2022-05-01) -
Study on deformation mechanism of slope under combined open-pit and underground mining in Fushun East Open-pit Mine
by: REN Jian, et al.
Published: (2022-11-01) -
Robust Localization for Underground Mining Vehicles: An Application in a Room and Pillar Mine
by: Felipe Inostroza, et al.
Published: (2023-09-01)