Perencanaan Kolam Retensi untuk Penanganan Banjir di Kecamatan Cicendo Kota Bandung
The current solution Bandung City Government do to avoiding flood was building the retarding basin. The purpose of this research was to plan the retention basin’s discharge, volume and area. This research was conducted on Bima Street, Cicendo which is drained by Citepus River. The research data incl...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Brawijaya
2023-05-01
|
Series: | Rekayasa Sipil |
Subjects: | |
Online Access: | https://rekayasasipil.ub.ac.id/index.php/rs/article/view/842/573 |
_version_ | 1797833722896056320 |
---|---|
author | Wahyu Al’amin Yati Muliati |
author_facet | Wahyu Al’amin Yati Muliati |
author_sort | Wahyu Al’amin |
collection | DOAJ |
description | The current solution Bandung City Government do to avoiding flood was building the retarding basin. The purpose of this research was to plan the retention basin’s discharge, volume and area. This research was conducted on Bima Street, Cicendo which is drained by Citepus River. The research data includes rainfall data from five rain posts, maps and existing river conditions. The analysis contains catchment area made from ArcGis program which result are 40 km2. Hydrological analysis produces the planned rain discharge for 100 years return period which is 20,22658 m3/s. Hydraulics analysis which is finding the discharge river existing. Basin discharge acquired from differences between rain discharge and river discharge then plan for inlet and outlet doors. Total capacity of retarding basin was 4360,5 m3. Inlet and outlet doors are planned each two doors with 2 meters width and 1 meter height. |
first_indexed | 2024-04-09T14:27:38Z |
format | Article |
id | doaj.art-dcae75726be94f3882e302ea93ea68d8 |
institution | Directory Open Access Journal |
issn | 1978-5658 2502-6348 |
language | English |
last_indexed | 2024-04-09T14:27:38Z |
publishDate | 2023-05-01 |
publisher | University of Brawijaya |
record_format | Article |
series | Rekayasa Sipil |
spelling | doaj.art-dcae75726be94f3882e302ea93ea68d82023-05-04T02:35:07ZengUniversity of BrawijayaRekayasa Sipil1978-56582502-63482023-05-01172115121https://doi.org/10.21776/ub.rekayasasipil.2023.017.02.1Perencanaan Kolam Retensi untuk Penanganan Banjir di Kecamatan Cicendo Kota BandungWahyu Al’amin0Yati Muliati1Institut Teknologi Nasional BandungInstitut Teknologi Nasional BandungThe current solution Bandung City Government do to avoiding flood was building the retarding basin. The purpose of this research was to plan the retention basin’s discharge, volume and area. This research was conducted on Bima Street, Cicendo which is drained by Citepus River. The research data includes rainfall data from five rain posts, maps and existing river conditions. The analysis contains catchment area made from ArcGis program which result are 40 km2. Hydrological analysis produces the planned rain discharge for 100 years return period which is 20,22658 m3/s. Hydraulics analysis which is finding the discharge river existing. Basin discharge acquired from differences between rain discharge and river discharge then plan for inlet and outlet doors. Total capacity of retarding basin was 4360,5 m3. Inlet and outlet doors are planned each two doors with 2 meters width and 1 meter height.https://rekayasasipil.ub.ac.id/index.php/rs/article/view/842/573floodretarding basin |
spellingShingle | Wahyu Al’amin Yati Muliati Perencanaan Kolam Retensi untuk Penanganan Banjir di Kecamatan Cicendo Kota Bandung Rekayasa Sipil flood retarding basin |
title | Perencanaan Kolam Retensi untuk Penanganan Banjir di Kecamatan Cicendo Kota Bandung |
title_full | Perencanaan Kolam Retensi untuk Penanganan Banjir di Kecamatan Cicendo Kota Bandung |
title_fullStr | Perencanaan Kolam Retensi untuk Penanganan Banjir di Kecamatan Cicendo Kota Bandung |
title_full_unstemmed | Perencanaan Kolam Retensi untuk Penanganan Banjir di Kecamatan Cicendo Kota Bandung |
title_short | Perencanaan Kolam Retensi untuk Penanganan Banjir di Kecamatan Cicendo Kota Bandung |
title_sort | perencanaan kolam retensi untuk penanganan banjir di kecamatan cicendo kota bandung |
topic | flood retarding basin |
url | https://rekayasasipil.ub.ac.id/index.php/rs/article/view/842/573 |
work_keys_str_mv | AT wahyualamin perencanaankolamretensiuntukpenangananbanjirdikecamatancicendokotabandung AT yatimuliati perencanaankolamretensiuntukpenangananbanjirdikecamatancicendokotabandung |