The Method of Optimization of Hydropower Plant Performance for Use in Group Active Power Controller

The problem of optimization of hydropower plant performance is considered in this paper. A new method of calculation of optimal load-sharing is proposed. The method is based on application of incremental water flow curves representing relationship between the per unit increase of water flow and acti...

Full description

Bibliographic Details
Main Author: Glazyrin G.V.
Format: Article
Language:English
Published: Academy of Sciences of Moldova 2017-04-01
Series:Problems of the Regional Energetics
Subjects:
Online Access:http://journal.ie.asm.md/assets/files/06_01_33_2017.pdf
Description
Summary:The problem of optimization of hydropower plant performance is considered in this paper. A new method of calculation of optimal load-sharing is proposed. The method is based on application of incremental water flow curves representing relationship between the per unit increase of water flow and active power. The optimal load-sharing is obtained by solving the nonlinear equation governing the balance of total active power and the station power set point with the same specific increase of water flow for all turbines. Unlike traditional optimization techniques, the solution of the equation is obtained without taking into account unit safe operating zones. Instead, if calculated active power of a unit violates the permissible power range, load-sharing is recalculated for the remaining generating units. Thus, optimal load-sharing algorithm suitable for digital control systems is developed. The proposed algorithm is implemented in group active power controller in Novosibirsk hydropower plant. An analysis of operation of group active power controller proves that the application of the proposed method allows obtaining optimal load-sharing at each control step with sufficient precision.
ISSN:1857-0070