The Method of Optimization of Hydropower Plant Performance for Use in Group Active Power Controller

The problem of optimization of hydropower plant performance is considered in this paper. A new method of calculation of optimal load-sharing is proposed. The method is based on application of incremental water flow curves representing relationship between the per unit increase of water flow and acti...

Full description

Bibliographic Details
Main Author: Glazyrin G.V.
Format: Article
Language:English
Published: Academy of Sciences of Moldova 2017-04-01
Series:Problems of the Regional Energetics
Subjects:
Online Access:http://journal.ie.asm.md/assets/files/06_01_33_2017.pdf
_version_ 1817979104015679488
author Glazyrin G.V.
author_facet Glazyrin G.V.
author_sort Glazyrin G.V.
collection DOAJ
description The problem of optimization of hydropower plant performance is considered in this paper. A new method of calculation of optimal load-sharing is proposed. The method is based on application of incremental water flow curves representing relationship between the per unit increase of water flow and active power. The optimal load-sharing is obtained by solving the nonlinear equation governing the balance of total active power and the station power set point with the same specific increase of water flow for all turbines. Unlike traditional optimization techniques, the solution of the equation is obtained without taking into account unit safe operating zones. Instead, if calculated active power of a unit violates the permissible power range, load-sharing is recalculated for the remaining generating units. Thus, optimal load-sharing algorithm suitable for digital control systems is developed. The proposed algorithm is implemented in group active power controller in Novosibirsk hydropower plant. An analysis of operation of group active power controller proves that the application of the proposed method allows obtaining optimal load-sharing at each control step with sufficient precision.
first_indexed 2024-04-13T22:38:29Z
format Article
id doaj.art-dd71466350304dc484002a9e830e3603
institution Directory Open Access Journal
issn 1857-0070
language English
last_indexed 2024-04-13T22:38:29Z
publishDate 2017-04-01
publisher Academy of Sciences of Moldova
record_format Article
series Problems of the Regional Energetics
spelling doaj.art-dd71466350304dc484002a9e830e36032022-12-22T02:26:42ZengAcademy of Sciences of MoldovaProblems of the Regional Energetics1857-00702017-04-013314044The Method of Optimization of Hydropower Plant Performance for Use in Group Active Power ControllerGlazyrin G.V.0Novosibirsk State Technical University Novosibirsk, Russian FederationThe problem of optimization of hydropower plant performance is considered in this paper. A new method of calculation of optimal load-sharing is proposed. The method is based on application of incremental water flow curves representing relationship between the per unit increase of water flow and active power. The optimal load-sharing is obtained by solving the nonlinear equation governing the balance of total active power and the station power set point with the same specific increase of water flow for all turbines. Unlike traditional optimization techniques, the solution of the equation is obtained without taking into account unit safe operating zones. Instead, if calculated active power of a unit violates the permissible power range, load-sharing is recalculated for the remaining generating units. Thus, optimal load-sharing algorithm suitable for digital control systems is developed. The proposed algorithm is implemented in group active power controller in Novosibirsk hydropower plant. An analysis of operation of group active power controller proves that the application of the proposed method allows obtaining optimal load-sharing at each control step with sufficient precision.http://journal.ie.asm.md/assets/files/06_01_33_2017.pdfhydropower plantactive power
spellingShingle Glazyrin G.V.
The Method of Optimization of Hydropower Plant Performance for Use in Group Active Power Controller
Problems of the Regional Energetics
hydropower plant
active power
title The Method of Optimization of Hydropower Plant Performance for Use in Group Active Power Controller
title_full The Method of Optimization of Hydropower Plant Performance for Use in Group Active Power Controller
title_fullStr The Method of Optimization of Hydropower Plant Performance for Use in Group Active Power Controller
title_full_unstemmed The Method of Optimization of Hydropower Plant Performance for Use in Group Active Power Controller
title_short The Method of Optimization of Hydropower Plant Performance for Use in Group Active Power Controller
title_sort method of optimization of hydropower plant performance for use in group active power controller
topic hydropower plant
active power
url http://journal.ie.asm.md/assets/files/06_01_33_2017.pdf
work_keys_str_mv AT glazyringv themethodofoptimizationofhydropowerplantperformanceforuseingroupactivepowercontroller
AT glazyringv methodofoptimizationofhydropowerplantperformanceforuseingroupactivepowercontroller