The efficient generation of 4D BIM construction schedules: A case study of the Nanterre 2 CESI project in France

Building Information Modelling (BIM) can be defined as a set of tools, processes and technologies that are enabled by a digital multi-dimensional representation of the physical and functional characteristics of a built asset. The ‘fourth’ dimension (4D BIM) incorporates time-related project informat...

Full description

Bibliographic Details
Main Authors: Omar Doukari, Boubacar Seck, David Greenwood
Format: Article
Language:English
Published: Frontiers Media S.A. 2022-09-01
Series:Frontiers in Built Environment
Subjects:
Online Access:https://www.frontiersin.org/articles/10.3389/fbuil.2022.998309/full
_version_ 1828147915932041216
author Omar Doukari
Boubacar Seck
David Greenwood
author_facet Omar Doukari
Boubacar Seck
David Greenwood
author_sort Omar Doukari
collection DOAJ
description Building Information Modelling (BIM) can be defined as a set of tools, processes and technologies that are enabled by a digital multi-dimensional representation of the physical and functional characteristics of a built asset. The ‘fourth’ dimension (4D BIM) incorporates time-related project information in the 3D model to simulate and optimise the project construction process. To achieve this, the 3D objects within the aggregated design model must be linked with each activity in the construction schedule. However, the levels of maturity and expertise in using BIM amongst the project participants still varies considerably. This generates collaboration problems within the project and adds further obstacles to the ability to derive full benefits from BIM. Ideally, 4D BIM can be automatically generated, but in reality, because the 3D and 4D models are created separately and at different stages of the project, this is not currently possible, and the process requires considerable manual effort. The research reported in this paper was prompted by the construction of a new training and research building: the Nanterre 2 CESI building in France. It proposes an efficient approach that minimises the effort of creating 4D BIM construction schedules. The CESI four-phase process aims to help project participants to fully exploit the potential of 4D BIM and enables: 1) a clear expression of the 4D BIM objectives; 2) the identification of information requirements and relevant workflows to achieve these objectives; 3) the implementation of a project schedule; and 4) BIM model production to suit the 4D BIM use case. Although the CESI approach was developed in the context of the French contracting system, the observations and conclusions of this study are intended to be generally applicable.
first_indexed 2024-04-11T21:07:17Z
format Article
id doaj.art-ddb6da3d91e244a1a8d4f5496379a531
institution Directory Open Access Journal
issn 2297-3362
language English
last_indexed 2024-04-11T21:07:17Z
publishDate 2022-09-01
publisher Frontiers Media S.A.
record_format Article
series Frontiers in Built Environment
spelling doaj.art-ddb6da3d91e244a1a8d4f5496379a5312022-12-22T04:03:15ZengFrontiers Media S.A.Frontiers in Built Environment2297-33622022-09-01810.3389/fbuil.2022.998309998309The efficient generation of 4D BIM construction schedules: A case study of the Nanterre 2 CESI project in FranceOmar Doukari0Boubacar Seck1David Greenwood2University of Northumbria, Newcastle-upon-Tyne, United KingtomCESI Ecole d’Ingénieurs, Nanterre, FranceUniversity of Northumbria, Newcastle-upon-Tyne, United KingtomBuilding Information Modelling (BIM) can be defined as a set of tools, processes and technologies that are enabled by a digital multi-dimensional representation of the physical and functional characteristics of a built asset. The ‘fourth’ dimension (4D BIM) incorporates time-related project information in the 3D model to simulate and optimise the project construction process. To achieve this, the 3D objects within the aggregated design model must be linked with each activity in the construction schedule. However, the levels of maturity and expertise in using BIM amongst the project participants still varies considerably. This generates collaboration problems within the project and adds further obstacles to the ability to derive full benefits from BIM. Ideally, 4D BIM can be automatically generated, but in reality, because the 3D and 4D models are created separately and at different stages of the project, this is not currently possible, and the process requires considerable manual effort. The research reported in this paper was prompted by the construction of a new training and research building: the Nanterre 2 CESI building in France. It proposes an efficient approach that minimises the effort of creating 4D BIM construction schedules. The CESI four-phase process aims to help project participants to fully exploit the potential of 4D BIM and enables: 1) a clear expression of the 4D BIM objectives; 2) the identification of information requirements and relevant workflows to achieve these objectives; 3) the implementation of a project schedule; and 4) BIM model production to suit the 4D BIM use case. Although the CESI approach was developed in the context of the French contracting system, the observations and conclusions of this study are intended to be generally applicable.https://www.frontiersin.org/articles/10.3389/fbuil.2022.998309/full4D BIMconstruction schedulingproject planninglean methodologyFrench BIM practicesurvey
spellingShingle Omar Doukari
Boubacar Seck
David Greenwood
The efficient generation of 4D BIM construction schedules: A case study of the Nanterre 2 CESI project in France
Frontiers in Built Environment
4D BIM
construction scheduling
project planning
lean methodology
French BIM practice
survey
title The efficient generation of 4D BIM construction schedules: A case study of the Nanterre 2 CESI project in France
title_full The efficient generation of 4D BIM construction schedules: A case study of the Nanterre 2 CESI project in France
title_fullStr The efficient generation of 4D BIM construction schedules: A case study of the Nanterre 2 CESI project in France
title_full_unstemmed The efficient generation of 4D BIM construction schedules: A case study of the Nanterre 2 CESI project in France
title_short The efficient generation of 4D BIM construction schedules: A case study of the Nanterre 2 CESI project in France
title_sort efficient generation of 4d bim construction schedules a case study of the nanterre 2 cesi project in france
topic 4D BIM
construction scheduling
project planning
lean methodology
French BIM practice
survey
url https://www.frontiersin.org/articles/10.3389/fbuil.2022.998309/full
work_keys_str_mv AT omardoukari theefficientgenerationof4dbimconstructionschedulesacasestudyofthenanterre2cesiprojectinfrance
AT boubacarseck theefficientgenerationof4dbimconstructionschedulesacasestudyofthenanterre2cesiprojectinfrance
AT davidgreenwood theefficientgenerationof4dbimconstructionschedulesacasestudyofthenanterre2cesiprojectinfrance
AT omardoukari efficientgenerationof4dbimconstructionschedulesacasestudyofthenanterre2cesiprojectinfrance
AT boubacarseck efficientgenerationof4dbimconstructionschedulesacasestudyofthenanterre2cesiprojectinfrance
AT davidgreenwood efficientgenerationof4dbimconstructionschedulesacasestudyofthenanterre2cesiprojectinfrance