Analysis of direct rework costs in Ukrainian construction
The construction industry of Ukraine has a number of problems and barriers that hinder its development. The main problems affecting Ukraine are corruption, high level of opacity, inefficient use of resources and inefficient process management. Moreover, ineffective design and construction management...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Polish Academy of Sciences
2021-06-01
|
Series: | Archives of Civil Engineering |
Subjects: | |
Online Access: | https://journals.pan.pl/Content/120002/24.ACE-00194_B5.pdf |
_version_ | 1818489460423131136 |
---|---|
author | Roman Trach Marzena Lendo-Siwicka Katarzyna Pawluk Mieczysław Połoński |
author_facet | Roman Trach Marzena Lendo-Siwicka Katarzyna Pawluk Mieczysław Połoński |
author_sort | Roman Trach |
collection | DOAJ |
description | The construction industry of Ukraine has a number of problems and barriers that hinder its development. The main problems affecting Ukraine are corruption, high level of opacity, inefficient use of resources and inefficient process management. Moreover, ineffective design and construction management reduce labor productivity and leads to reworks. Unfortunately, in Ukrainian construction industry most cases of rework have been accepted as a part of construction activities. Rework is one of the main factors in the growth of total costs and the excess of the schedule for the construction project. The problem of rework costs is important and needs to be studied more to alleviate these overruns in the future. However, rework data are usually quite difficult to obtain and most studies have been conducted in developed countries. It can be assumed that there is a greater probability of reworks and rework costs in developing countries than in the developed ones. Thus, the purpose of this article was to determine and systematize reworks factors, quantify amount of direct rework costs, determine the relationship between actual project costs, project duration variation and rework costs. |
first_indexed | 2024-12-10T17:04:01Z |
format | Article |
id | doaj.art-de3aa6225cf6463580a47d71b17ed723 |
institution | Directory Open Access Journal |
issn | 2300-3103 |
language | English |
last_indexed | 2024-12-10T17:04:01Z |
publishDate | 2021-06-01 |
publisher | Polish Academy of Sciences |
record_format | Article |
series | Archives of Civil Engineering |
spelling | doaj.art-de3aa6225cf6463580a47d71b17ed7232022-12-22T01:40:31ZengPolish Academy of SciencesArchives of Civil Engineering2300-31032021-06-01vol. 67No 2397411https://doi.org/10.24425/ace.2021.137175Analysis of direct rework costs in Ukrainian constructionRoman Trach0https://orcid.org/0000-0001-6654-9870Marzena Lendo-Siwicka1https://orcid.org/0000-0003-3457-2464Katarzyna Pawluk2https://orcid.org/0000-0002-6632-832XMieczysław Połoński3https://orcid.org/0000-0002-4510-2313PhD., Warsaw University of Life Sciences-SGGW, Institute of Civil Engineering, ul. Nowoursynowska 159, 02-776 Warsaw, PolandPhD., Eng., Warsaw University of Life Sciences-SGGW, Institute of Civil Engineering, ul. Nowoursynowska 159, 02-776 Warsaw, PolandPhD., Eng., Warsaw University of Life Sciences-SGGW, Institute of Civil Engineering, ul. Nowoursynowska 159, 02-776 Warsaw, PolandProf. PhD. Eng., Warsaw University of Life Sciences-SGGW, Institute of Civil Engineering, ul. Nowoursynowska 159, 02-776 Warsaw, PolandThe construction industry of Ukraine has a number of problems and barriers that hinder its development. The main problems affecting Ukraine are corruption, high level of opacity, inefficient use of resources and inefficient process management. Moreover, ineffective design and construction management reduce labor productivity and leads to reworks. Unfortunately, in Ukrainian construction industry most cases of rework have been accepted as a part of construction activities. Rework is one of the main factors in the growth of total costs and the excess of the schedule for the construction project. The problem of rework costs is important and needs to be studied more to alleviate these overruns in the future. However, rework data are usually quite difficult to obtain and most studies have been conducted in developed countries. It can be assumed that there is a greater probability of reworks and rework costs in developing countries than in the developed ones. Thus, the purpose of this article was to determine and systematize reworks factors, quantify amount of direct rework costs, determine the relationship between actual project costs, project duration variation and rework costs.https://journals.pan.pl/Content/120002/24.ACE-00194_B5.pdfreworkrework factorsrework costsdirect costsconstruction |
spellingShingle | Roman Trach Marzena Lendo-Siwicka Katarzyna Pawluk Mieczysław Połoński Analysis of direct rework costs in Ukrainian construction Archives of Civil Engineering rework rework factors rework costs direct costs construction |
title | Analysis of direct rework costs in Ukrainian construction |
title_full | Analysis of direct rework costs in Ukrainian construction |
title_fullStr | Analysis of direct rework costs in Ukrainian construction |
title_full_unstemmed | Analysis of direct rework costs in Ukrainian construction |
title_short | Analysis of direct rework costs in Ukrainian construction |
title_sort | analysis of direct rework costs in ukrainian construction |
topic | rework rework factors rework costs direct costs construction |
url | https://journals.pan.pl/Content/120002/24.ACE-00194_B5.pdf |
work_keys_str_mv | AT romantrach analysisofdirectreworkcostsinukrainianconstruction AT marzenalendosiwicka analysisofdirectreworkcostsinukrainianconstruction AT katarzynapawluk analysisofdirectreworkcostsinukrainianconstruction AT mieczysławpołonski analysisofdirectreworkcostsinukrainianconstruction |