Analysis of direct rework costs in Ukrainian construction

The construction industry of Ukraine has a number of problems and barriers that hinder its development. The main problems affecting Ukraine are corruption, high level of opacity, inefficient use of resources and inefficient process management. Moreover, ineffective design and construction management...

Full description

Bibliographic Details
Main Authors: Roman Trach, Marzena Lendo-Siwicka, Katarzyna Pawluk, Mieczysław Połoński
Format: Article
Language:English
Published: Polish Academy of Sciences 2021-06-01
Series:Archives of Civil Engineering
Subjects:
Online Access:https://journals.pan.pl/Content/120002/24.ACE-00194_B5.pdf
_version_ 1818489460423131136
author Roman Trach
Marzena Lendo-Siwicka
Katarzyna Pawluk
Mieczysław Połoński
author_facet Roman Trach
Marzena Lendo-Siwicka
Katarzyna Pawluk
Mieczysław Połoński
author_sort Roman Trach
collection DOAJ
description The construction industry of Ukraine has a number of problems and barriers that hinder its development. The main problems affecting Ukraine are corruption, high level of opacity, inefficient use of resources and inefficient process management. Moreover, ineffective design and construction management reduce labor productivity and leads to reworks. Unfortunately, in Ukrainian construction industry most cases of rework have been accepted as a part of construction activities. Rework is one of the main factors in the growth of total costs and the excess of the schedule for the construction project. The problem of rework costs is important and needs to be studied more to alleviate these overruns in the future. However, rework data are usually quite difficult to obtain and most studies have been conducted in developed countries. It can be assumed that there is a greater probability of reworks and rework costs in developing countries than in the developed ones. Thus, the purpose of this article was to determine and systematize reworks factors, quantify amount of direct rework costs, determine the relationship between actual project costs, project duration variation and rework costs.
first_indexed 2024-12-10T17:04:01Z
format Article
id doaj.art-de3aa6225cf6463580a47d71b17ed723
institution Directory Open Access Journal
issn 2300-3103
language English
last_indexed 2024-12-10T17:04:01Z
publishDate 2021-06-01
publisher Polish Academy of Sciences
record_format Article
series Archives of Civil Engineering
spelling doaj.art-de3aa6225cf6463580a47d71b17ed7232022-12-22T01:40:31ZengPolish Academy of SciencesArchives of Civil Engineering2300-31032021-06-01vol. 67No 2397411https://doi.org/10.24425/ace.2021.137175Analysis of direct rework costs in Ukrainian constructionRoman Trach0https://orcid.org/0000-0001-6654-9870Marzena Lendo-Siwicka1https://orcid.org/0000-0003-3457-2464Katarzyna Pawluk2https://orcid.org/0000-0002-6632-832XMieczysław Połoński3https://orcid.org/0000-0002-4510-2313PhD., Warsaw University of Life Sciences-SGGW, Institute of Civil Engineering, ul. Nowoursynowska 159, 02-776 Warsaw, PolandPhD., Eng., Warsaw University of Life Sciences-SGGW, Institute of Civil Engineering, ul. Nowoursynowska 159, 02-776 Warsaw, PolandPhD., Eng., Warsaw University of Life Sciences-SGGW, Institute of Civil Engineering, ul. Nowoursynowska 159, 02-776 Warsaw, PolandProf. PhD. Eng., Warsaw University of Life Sciences-SGGW, Institute of Civil Engineering, ul. Nowoursynowska 159, 02-776 Warsaw, PolandThe construction industry of Ukraine has a number of problems and barriers that hinder its development. The main problems affecting Ukraine are corruption, high level of opacity, inefficient use of resources and inefficient process management. Moreover, ineffective design and construction management reduce labor productivity and leads to reworks. Unfortunately, in Ukrainian construction industry most cases of rework have been accepted as a part of construction activities. Rework is one of the main factors in the growth of total costs and the excess of the schedule for the construction project. The problem of rework costs is important and needs to be studied more to alleviate these overruns in the future. However, rework data are usually quite difficult to obtain and most studies have been conducted in developed countries. It can be assumed that there is a greater probability of reworks and rework costs in developing countries than in the developed ones. Thus, the purpose of this article was to determine and systematize reworks factors, quantify amount of direct rework costs, determine the relationship between actual project costs, project duration variation and rework costs.https://journals.pan.pl/Content/120002/24.ACE-00194_B5.pdfreworkrework factorsrework costsdirect costsconstruction
spellingShingle Roman Trach
Marzena Lendo-Siwicka
Katarzyna Pawluk
Mieczysław Połoński
Analysis of direct rework costs in Ukrainian construction
Archives of Civil Engineering
rework
rework factors
rework costs
direct costs
construction
title Analysis of direct rework costs in Ukrainian construction
title_full Analysis of direct rework costs in Ukrainian construction
title_fullStr Analysis of direct rework costs in Ukrainian construction
title_full_unstemmed Analysis of direct rework costs in Ukrainian construction
title_short Analysis of direct rework costs in Ukrainian construction
title_sort analysis of direct rework costs in ukrainian construction
topic rework
rework factors
rework costs
direct costs
construction
url https://journals.pan.pl/Content/120002/24.ACE-00194_B5.pdf
work_keys_str_mv AT romantrach analysisofdirectreworkcostsinukrainianconstruction
AT marzenalendosiwicka analysisofdirectreworkcostsinukrainianconstruction
AT katarzynapawluk analysisofdirectreworkcostsinukrainianconstruction
AT mieczysławpołonski analysisofdirectreworkcostsinukrainianconstruction