Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur
This study discusses the Planning of a Rooftop Solar Power Plant with a Hybrid System at PT East Colony Kudus. The model is set as a PLTS whose solar panels are adjusted to the roof area of the building. This PLTS is functioned as a new renewable energy resource (EBT) in the form of a hybrid between...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | Indonesian |
Published: |
Universitas Semarang
2022-04-01
|
Series: | Elektrika |
Subjects: | |
Online Access: | https://journals.usm.ac.id/index.php/elektrika/article/view/3784 |
_version_ | 1827630475089281024 |
---|---|
author | Noor Hajir Sudarjo Muhamad Haddin Agus Suprajitno |
author_facet | Noor Hajir Sudarjo Muhamad Haddin Agus Suprajitno |
author_sort | Noor Hajir Sudarjo |
collection | DOAJ |
description | This study discusses the Planning of a Rooftop Solar Power Plant with a Hybrid System at PT East Colony Kudus. The
model is set as a PLTS whose solar panels are adjusted to the roof area of the building. This PLTS is functioned as a new
renewable energy resource (EBT) in the form of a hybrid between PLTS and PLN's electrical energy source, this is done to
help supply electricity. Parameters determined include: roof area, solar panel capacity, inverter capacity, battery capacity
and payback period. The results show that PLTS with a total of 80 solar panels installed with a capacity of each panel 405
Watt peak, then obtained a power capacity of 32.4 kilo Watt peak which is divided into 5 arrays, with a solar charger controller
and inverter using a 10kW capacity of 5 units, 80 batteries with a capacity of 400Ah. So that PLTS is able to contribute 39.3%
of the total power needed by PT East Colony (electric power from PLN is 60.7%). This hybrid payback period will return after
8 years and 7 months. |
first_indexed | 2024-03-09T14:07:19Z |
format | Article |
id | doaj.art-deb98d4e8ea24606a1d068694f175c8d |
institution | Directory Open Access Journal |
issn | 2085-0565 |
language | Indonesian |
last_indexed | 2024-03-09T14:07:19Z |
publishDate | 2022-04-01 |
publisher | Universitas Semarang |
record_format | Article |
series | Elektrika |
spelling | doaj.art-deb98d4e8ea24606a1d068694f175c8d2023-11-30T03:58:46ZindUniversitas SemarangElektrika2085-05652022-04-01141202510.26623/elektrika.v14i1.37842424Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni TimurNoor Hajir Sudarjo0Muhamad Haddin1Agus Suprajitno2Program Studi Teknik Elektro, Fakultas Teknologi Industri, Universitas Islam Sultan AgungProgram Studi Teknik Elektro, Fakultas Teknologi Industri, Universitas Islam Sultan AgungProgram Studi Teknik Elektro, Fakultas Teknologi Industri, Universitas Islam Sultan AgungThis study discusses the Planning of a Rooftop Solar Power Plant with a Hybrid System at PT East Colony Kudus. The model is set as a PLTS whose solar panels are adjusted to the roof area of the building. This PLTS is functioned as a new renewable energy resource (EBT) in the form of a hybrid between PLTS and PLN's electrical energy source, this is done to help supply electricity. Parameters determined include: roof area, solar panel capacity, inverter capacity, battery capacity and payback period. The results show that PLTS with a total of 80 solar panels installed with a capacity of each panel 405 Watt peak, then obtained a power capacity of 32.4 kilo Watt peak which is divided into 5 arrays, with a solar charger controller and inverter using a 10kW capacity of 5 units, 80 batteries with a capacity of 400Ah. So that PLTS is able to contribute 39.3% of the total power needed by PT East Colony (electric power from PLN is 60.7%). This hybrid payback period will return after 8 years and 7 months.https://journals.usm.ac.id/index.php/elektrika/article/view/3784plts, hybrid, pt east colony |
spellingShingle | Noor Hajir Sudarjo Muhamad Haddin Agus Suprajitno Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur Elektrika plts, hybrid, pt east colony |
title | Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur |
title_full | Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur |
title_fullStr | Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur |
title_full_unstemmed | Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur |
title_short | Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur |
title_sort | analisa perencanaan pembangkit listrik tenaga surya atap dengan sistem hybrid di pt koloni timur |
topic | plts, hybrid, pt east colony |
url | https://journals.usm.ac.id/index.php/elektrika/article/view/3784 |
work_keys_str_mv | AT noorhajirsudarjo analisaperencanaanpembangkitlistriktenagasuryaatapdengansistemhybriddiptkolonitimur AT muhamadhaddin analisaperencanaanpembangkitlistriktenagasuryaatapdengansistemhybriddiptkolonitimur AT agussuprajitno analisaperencanaanpembangkitlistriktenagasuryaatapdengansistemhybriddiptkolonitimur |