Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur

This study discusses the Planning of a Rooftop Solar Power Plant with a Hybrid System at PT East Colony Kudus. The model is set as a PLTS whose solar panels are adjusted to the roof area of the building. This PLTS is functioned as a new renewable energy resource (EBT) in the form of a hybrid between...

Full description

Bibliographic Details
Main Authors: Noor Hajir Sudarjo, Muhamad Haddin, Agus Suprajitno
Format: Article
Language:Indonesian
Published: Universitas Semarang 2022-04-01
Series:Elektrika
Subjects:
Online Access:https://journals.usm.ac.id/index.php/elektrika/article/view/3784
_version_ 1827630475089281024
author Noor Hajir Sudarjo
Muhamad Haddin
Agus Suprajitno
author_facet Noor Hajir Sudarjo
Muhamad Haddin
Agus Suprajitno
author_sort Noor Hajir Sudarjo
collection DOAJ
description This study discusses the Planning of a Rooftop Solar Power Plant with a Hybrid System at PT East Colony Kudus. The model is set as a PLTS whose solar panels are adjusted to the roof area of the building. This PLTS is functioned as a new renewable energy resource (EBT) in the form of a hybrid between PLTS and PLN's electrical energy source, this is done to help supply electricity. Parameters determined include: roof area, solar panel capacity, inverter capacity, battery capacity and payback period. The results show that PLTS with a total of 80 solar panels installed with a capacity of each panel 405 Watt peak, then obtained a power capacity of 32.4 kilo Watt peak which is divided into 5 arrays, with a solar charger controller and inverter using a 10kW capacity of 5 units, 80 batteries with a capacity of 400Ah. So that PLTS is able to contribute 39.3% of the total power needed by PT East Colony (electric power from PLN is 60.7%). This hybrid payback period will return after 8 years and 7 months.
first_indexed 2024-03-09T14:07:19Z
format Article
id doaj.art-deb98d4e8ea24606a1d068694f175c8d
institution Directory Open Access Journal
issn 2085-0565
language Indonesian
last_indexed 2024-03-09T14:07:19Z
publishDate 2022-04-01
publisher Universitas Semarang
record_format Article
series Elektrika
spelling doaj.art-deb98d4e8ea24606a1d068694f175c8d2023-11-30T03:58:46ZindUniversitas SemarangElektrika2085-05652022-04-01141202510.26623/elektrika.v14i1.37842424Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni TimurNoor Hajir Sudarjo0Muhamad Haddin1Agus Suprajitno2Program Studi Teknik Elektro, Fakultas Teknologi Industri, Universitas Islam Sultan AgungProgram Studi Teknik Elektro, Fakultas Teknologi Industri, Universitas Islam Sultan AgungProgram Studi Teknik Elektro, Fakultas Teknologi Industri, Universitas Islam Sultan AgungThis study discusses the Planning of a Rooftop Solar Power Plant with a Hybrid System at PT East Colony Kudus. The model is set as a PLTS whose solar panels are adjusted to the roof area of the building. This PLTS is functioned as a new renewable energy resource (EBT) in the form of a hybrid between PLTS and PLN's electrical energy source, this is done to help supply electricity. Parameters determined include: roof area, solar panel capacity, inverter capacity, battery capacity and payback period. The results show that PLTS with a total of 80 solar panels installed with a capacity of each panel 405 Watt peak, then obtained a power capacity of 32.4 kilo Watt peak which is divided into 5 arrays, with a solar charger controller and inverter using a 10kW capacity of 5 units, 80 batteries with a capacity of 400Ah. So that PLTS is able to contribute 39.3% of the total power needed by PT East Colony (electric power from PLN is 60.7%). This hybrid payback period will return after 8 years and 7 months.https://journals.usm.ac.id/index.php/elektrika/article/view/3784plts, hybrid, pt east colony
spellingShingle Noor Hajir Sudarjo
Muhamad Haddin
Agus Suprajitno
Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur
Elektrika
plts, hybrid, pt east colony
title Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur
title_full Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur
title_fullStr Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur
title_full_unstemmed Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur
title_short Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur
title_sort analisa perencanaan pembangkit listrik tenaga surya atap dengan sistem hybrid di pt koloni timur
topic plts, hybrid, pt east colony
url https://journals.usm.ac.id/index.php/elektrika/article/view/3784
work_keys_str_mv AT noorhajirsudarjo analisaperencanaanpembangkitlistriktenagasuryaatapdengansistemhybriddiptkolonitimur
AT muhamadhaddin analisaperencanaanpembangkitlistriktenagasuryaatapdengansistemhybriddiptkolonitimur
AT agussuprajitno analisaperencanaanpembangkitlistriktenagasuryaatapdengansistemhybriddiptkolonitimur