Penentuan Interval Waktu Penggantian Komponen Kritis Pada Mesin Volpack Menggunakan Metode Age Replacement
CV. Cool Clean is a company engaged in packing tissue. During this time the company only perform corrective action that causes disruption of the production process due to frequent damage of a sudden the engine components volpack. In this study used a model of preventive replacement that can reduce d...
Main Author: | Yanuar Yuda Prawiro |
---|---|
Format: | Article |
Language: | English |
Published: |
Jurusan Teknik Industri, Fakultas Teknik Universitas Muhammadiyah Malang
2017-05-01
|
Series: | Jurnal Teknik Industri |
Subjects: | |
Online Access: | http://ejournal.umm.ac.id/index.php/industri/article/view/5932 |
Similar Items
-
PREVENTIVE MAINTENANCE MENGGUNAKAN RELIABILITY CENTERED MAINTENANCE (RCM) DI PT. AGRONESIA INKABA
by: Ragil Pardiyono, et al.
Published: (2020-07-01) -
PERANCANGAN PENJADWALAN PREVENTIVE MAINTENANCE PADA PT. ARTHA PRIMA SUKSES MAKMUR
by: Yugowati Praharsi, et al.
Published: (2015-06-01) -
PERANCANGAN PENJADWALAN PREVENTIVE MAINTENANCE PADA PT. ARTHA PRIMA SUKSES MAKMUR
by: Yugowati Praharsi, et al.
Published: (2015-06-01) -
ANALISIS INTERVAL PEMELIHARAAN KOMPONEN KRITIS UNIT FUEL CONVEYOR DENGAN PENDEKATAN RELIABILITY CENTERED MAINTENANCE (RCM)
by: Marimin, et al.
Published: (2022-04-01) -
Analisis Efektivitas Mesin Injection 2500 Ton di Bagian Produksi PT.XYZ Menggunakan Metode Overall Equipment Effectiveness
by: Sri Widiyanti Putri, et al.
Published: (2022-11-01)