Skenario Pengembangan Fasilitas Sistem Pengolahan Sampah Dengan Pendekatan Cost Benefit Analysis Di Kelurahan Kedamaian Kota Bandar Lampung

Bandar Lampung City is part of the major city of Lampung province. The problem that arises in Bandar Lampung City is solid waste management. The amount of solid waste in Bandar Lampung City reaches 1000 tons/day. One of the district  of Bandar Lampung named Kedamaian district still uses the old meth...

Full description

Bibliographic Details
Main Authors: Arlina Phelia, Ria Oktaviani Sinia
Format: Article
Language:English
Published: University of Serambi Mekkah 2021-01-01
Series:Jurnal Serambi Engineering
Subjects:
Online Access:https://ojs.serambimekkah.ac.id/jse/article/view/2611
_version_ 1811185501141467136
author Arlina Phelia
Ria Oktaviani Sinia
author_facet Arlina Phelia
Ria Oktaviani Sinia
author_sort Arlina Phelia
collection DOAJ
description Bandar Lampung City is part of the major city of Lampung province. The problem that arises in Bandar Lampung City is solid waste management. The amount of solid waste in Bandar Lampung City reaches 1000 tons/day. One of the district  of Bandar Lampung named Kedamaian district still uses the old method (collecting-transport-throw) in solid waste management, which  causes the load of waste to accumulate in the landfill. The constraints encountered  this time are the absence of sorting locations  and limited land. Kedamaian district needs to develop waste  treatment facilities, an approach based on  Cost Benefit Analysis (CBA). The results show  from the analysis that BCR in the scenario A 1 is 0.85 with NPV - Rp. 72.968.828. the  activity in the existing conditions can still be carried out, but the waste reduction has not been maximized to the TPS (Container). Scenario B, NPV is Rp. 95.319.338 and BCR is 1.13, which value of BCR is 1. This indicates that a waste processing facility  in the Kedamaian District is suitable to  operate  with TPS-3R. The results of scenario B are  obtained by increasing the effectiveness of processing facilities to 100% by  2025. In 2025, with the implementation of the TPS-3R obtained, BCR is 1.20 with NPV is Rp. 218.447.621.
first_indexed 2024-04-11T13:30:28Z
format Article
id doaj.art-dfdccb622d914ba9a5dd64850a92effc
institution Directory Open Access Journal
issn 2528-3561
2541-1934
language English
last_indexed 2024-04-11T13:30:28Z
publishDate 2021-01-01
publisher University of Serambi Mekkah
record_format Article
series Jurnal Serambi Engineering
spelling doaj.art-dfdccb622d914ba9a5dd64850a92effc2022-12-22T04:21:51ZengUniversity of Serambi MekkahJurnal Serambi Engineering2528-35612541-19342021-01-016110.32672/jse.v6i1.26112220Skenario Pengembangan Fasilitas Sistem Pengolahan Sampah Dengan Pendekatan Cost Benefit Analysis Di Kelurahan Kedamaian Kota Bandar LampungArlina PheliaRia Oktaviani SiniaBandar Lampung City is part of the major city of Lampung province. The problem that arises in Bandar Lampung City is solid waste management. The amount of solid waste in Bandar Lampung City reaches 1000 tons/day. One of the district  of Bandar Lampung named Kedamaian district still uses the old method (collecting-transport-throw) in solid waste management, which  causes the load of waste to accumulate in the landfill. The constraints encountered  this time are the absence of sorting locations  and limited land. Kedamaian district needs to develop waste  treatment facilities, an approach based on  Cost Benefit Analysis (CBA). The results show  from the analysis that BCR in the scenario A 1 is 0.85 with NPV - Rp. 72.968.828. the  activity in the existing conditions can still be carried out, but the waste reduction has not been maximized to the TPS (Container). Scenario B, NPV is Rp. 95.319.338 and BCR is 1.13, which value of BCR is 1. This indicates that a waste processing facility  in the Kedamaian District is suitable to  operate  with TPS-3R. The results of scenario B are  obtained by increasing the effectiveness of processing facilities to 100% by  2025. In 2025, with the implementation of the TPS-3R obtained, BCR is 1.20 with NPV is Rp. 218.447.621.https://ojs.serambimekkah.ac.id/jse/article/view/2611bandar lampung, cost benefit analysis, net present value, tps-3r, waste
spellingShingle Arlina Phelia
Ria Oktaviani Sinia
Skenario Pengembangan Fasilitas Sistem Pengolahan Sampah Dengan Pendekatan Cost Benefit Analysis Di Kelurahan Kedamaian Kota Bandar Lampung
Jurnal Serambi Engineering
bandar lampung, cost benefit analysis, net present value, tps-3r, waste
title Skenario Pengembangan Fasilitas Sistem Pengolahan Sampah Dengan Pendekatan Cost Benefit Analysis Di Kelurahan Kedamaian Kota Bandar Lampung
title_full Skenario Pengembangan Fasilitas Sistem Pengolahan Sampah Dengan Pendekatan Cost Benefit Analysis Di Kelurahan Kedamaian Kota Bandar Lampung
title_fullStr Skenario Pengembangan Fasilitas Sistem Pengolahan Sampah Dengan Pendekatan Cost Benefit Analysis Di Kelurahan Kedamaian Kota Bandar Lampung
title_full_unstemmed Skenario Pengembangan Fasilitas Sistem Pengolahan Sampah Dengan Pendekatan Cost Benefit Analysis Di Kelurahan Kedamaian Kota Bandar Lampung
title_short Skenario Pengembangan Fasilitas Sistem Pengolahan Sampah Dengan Pendekatan Cost Benefit Analysis Di Kelurahan Kedamaian Kota Bandar Lampung
title_sort skenario pengembangan fasilitas sistem pengolahan sampah dengan pendekatan cost benefit analysis di kelurahan kedamaian kota bandar lampung
topic bandar lampung, cost benefit analysis, net present value, tps-3r, waste
url https://ojs.serambimekkah.ac.id/jse/article/view/2611
work_keys_str_mv AT arlinaphelia skenariopengembanganfasilitassistempengolahansampahdenganpendekatancostbenefitanalysisdikelurahankedamaiankotabandarlampung
AT riaoktavianisinia skenariopengembanganfasilitassistempengolahansampahdenganpendekatancostbenefitanalysisdikelurahankedamaiankotabandarlampung