Large Section of Soft Rock Gob-Side Entry Retaining Surrounding Rock Control

When cutting roof and pressure relief, the impact of blasting is especially obvious on the integrity of the roof of a large-section soft-rock roadway. The reasonable parameters of blasting roof cutting were studied through using Xiaohezui coal mine -12110 roadway as the engineering background. The L...

Full description

Bibliographic Details
Main Authors: Xizhi Wang, Yongjian Zhu, Ping Wang, Heng Ren, Peng Li, Xianwen He, Jianhua Lv
Format: Article
Language:English
Published: Hindawi Limited 2024-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2024/9942330
_version_ 1797338516582039552
author Xizhi Wang
Yongjian Zhu
Ping Wang
Heng Ren
Peng Li
Xianwen He
Jianhua Lv
author_facet Xizhi Wang
Yongjian Zhu
Ping Wang
Heng Ren
Peng Li
Xianwen He
Jianhua Lv
author_sort Xizhi Wang
collection DOAJ
description When cutting roof and pressure relief, the impact of blasting is especially obvious on the integrity of the roof of a large-section soft-rock roadway. The reasonable parameters of blasting roof cutting were studied through using Xiaohezui coal mine -12110 roadway as the engineering background. The LS-Dyna simulation results show that: Interval blasting is beneficial to the expansion of interhole cracks and the damage to the perimeter of the hole is smaller than that of adjacent blasting, the lower the charge uncoupling factor, the larger the perimeter of the hole fragmentation zone. The mechanical model of the large-section soft-rock roadway after retrieval was established, the support resistance equation of the roadway side support and the gangue in the extraction area was derived, and the minimum support force required for the roadway side support was solved. According to the site situation, the roadway support scheme for different areas was proposed, and after continuous delamination monitoring of the roof plate, it was found that the amount of roof-plate delamination was finally stabilized within 180 mm after the working face was advanced, and the effect of leaving the roadway was good.
first_indexed 2024-03-08T09:32:23Z
format Article
id doaj.art-e0427c83c44f458e9f667bac0c3a41be
institution Directory Open Access Journal
issn 1687-8094
language English
last_indexed 2024-03-08T09:32:23Z
publishDate 2024-01-01
publisher Hindawi Limited
record_format Article
series Advances in Civil Engineering
spelling doaj.art-e0427c83c44f458e9f667bac0c3a41be2024-01-31T00:00:37ZengHindawi LimitedAdvances in Civil Engineering1687-80942024-01-01202410.1155/2024/9942330Large Section of Soft Rock Gob-Side Entry Retaining Surrounding Rock ControlXizhi Wang0Yongjian Zhu1Ping Wang2Heng Ren3Peng Li4Xianwen He5Jianhua Lv6School of Resources and Environment and Safety EngineeringSchool of Resources and Environment and Safety EngineeringSchool of Resources and Environment and Safety EngineeringSchool of Resources and Environment and Safety EngineeringSchool of Resources and Environment and Safety EngineeringXiaohezui Coal MineXiaohezui Coal MineWhen cutting roof and pressure relief, the impact of blasting is especially obvious on the integrity of the roof of a large-section soft-rock roadway. The reasonable parameters of blasting roof cutting were studied through using Xiaohezui coal mine -12110 roadway as the engineering background. The LS-Dyna simulation results show that: Interval blasting is beneficial to the expansion of interhole cracks and the damage to the perimeter of the hole is smaller than that of adjacent blasting, the lower the charge uncoupling factor, the larger the perimeter of the hole fragmentation zone. The mechanical model of the large-section soft-rock roadway after retrieval was established, the support resistance equation of the roadway side support and the gangue in the extraction area was derived, and the minimum support force required for the roadway side support was solved. According to the site situation, the roadway support scheme for different areas was proposed, and after continuous delamination monitoring of the roof plate, it was found that the amount of roof-plate delamination was finally stabilized within 180 mm after the working face was advanced, and the effect of leaving the roadway was good.http://dx.doi.org/10.1155/2024/9942330
spellingShingle Xizhi Wang
Yongjian Zhu
Ping Wang
Heng Ren
Peng Li
Xianwen He
Jianhua Lv
Large Section of Soft Rock Gob-Side Entry Retaining Surrounding Rock Control
Advances in Civil Engineering
title Large Section of Soft Rock Gob-Side Entry Retaining Surrounding Rock Control
title_full Large Section of Soft Rock Gob-Side Entry Retaining Surrounding Rock Control
title_fullStr Large Section of Soft Rock Gob-Side Entry Retaining Surrounding Rock Control
title_full_unstemmed Large Section of Soft Rock Gob-Side Entry Retaining Surrounding Rock Control
title_short Large Section of Soft Rock Gob-Side Entry Retaining Surrounding Rock Control
title_sort large section of soft rock gob side entry retaining surrounding rock control
url http://dx.doi.org/10.1155/2024/9942330
work_keys_str_mv AT xizhiwang largesectionofsoftrockgobsideentryretainingsurroundingrockcontrol
AT yongjianzhu largesectionofsoftrockgobsideentryretainingsurroundingrockcontrol
AT pingwang largesectionofsoftrockgobsideentryretainingsurroundingrockcontrol
AT hengren largesectionofsoftrockgobsideentryretainingsurroundingrockcontrol
AT pengli largesectionofsoftrockgobsideentryretainingsurroundingrockcontrol
AT xianwenhe largesectionofsoftrockgobsideentryretainingsurroundingrockcontrol
AT jianhualv largesectionofsoftrockgobsideentryretainingsurroundingrockcontrol