Analysis of Model Loading and Unloading Time of Ships at Boom Baru Port, Palembang, Indonesia
Logistic transport passing through road transport in Palembang city has been very high. To support green Transport, it is recommended to convert some of land logistic transports to river transport. However, the river transport has not been ready in terms of dredging and maintaining water level of Mu...
Main Authors: | Buchari Erika, Putranto Dinar Dwi Anugerah, Rahman Aulia |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2017-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://doi.org/10.1051/matecconf/201713807012 |
Similar Items
-
Effect of sedimentation volume on productivity and dwelling time of ships at bom baru port
by: Dinar DA Putranto, et al.
Published: (2017-01-01) -
Bulk ports, ship loading and unloading /
by: Wohlbier, Reinhard H.
Published: (1994) -
Load Unloading Equipment, Workers (Longshormen), and Ship Service to Performance of General Cargo Loads Unloading in Terminal Jamrud Port of Tanjung Perak, Surabaya
by: Titiek Suntari, et al.
Published: (2020-04-01) -
Prevention activities in ship loading and unloading operations
by: Fraitag Daniel Nicu, et al.
Published: (2022-01-01) -
Efektifitas Perlindungan Kawat Tanah Jaringan SUTM 20 kV Gardu Induk Boom Baru Palembang
by: Wiwin Armoldo Oktaviani, et al.
Published: (2019-09-01)