Operational dimension of post-disaster housing temporality and technical control tools
The article illustrates a theoretical research path and project experimentation on post-disaster temporary housing modules in order to verify if and how the temporary dimension of the intervention is strategic for the implementation of the transition towards reconstruction, and in line with requests...
Main Author: | Roberto Bologna |
---|---|
Format: | Article |
Language: | English |
Published: |
Firenze University Press
2020-07-01
|
Series: | Techne |
Subjects: | |
Online Access: | https://oaj.fupress.net/index.php/techne/article/view/8232 |
Similar Items
-
Enhancing cultural adequacy in post-disaster temporary housing
by: Vibhas Sukhwani, et al.
Published: (2021-10-01) -
Sustainability of Temporary Housing in Post-Disaster Scenarios: A Requirement-Based Design Strategy
by: Giammarco Montalbano, et al.
Published: (2023-11-01) -
A study on the condition of temporary housing following disasters: Focus on container housing
by: Yan Hong
Published: (2017-09-01) -
A region-based criterion weighting approach for the assessment of post-disaster shelters
by: Betül Kavaklı, et al.
Published: (2023-12-01) -
Problems and Possible Solutions of Post-Disaster Housing Reconstruction Projects in India
by: Sanchaniya Rashmi, et al.
Published: (2023-01-01)