The collective effect of rework, expedited-rate, external source, and machine failures on manufacturing runtime planning
Production managers face the growing trend of rapid-response orders and inevitable production defects and failures; they must carefully measure these factors’ effects to minimize operating expenditures and operational disruption. Inspired by assisting producers decide the optimal runtime po...
Main Authors: | Yuan-Shyi Peter Chiu, Singa Wang Chiu, Tiffany Chiu, Hui-Chi Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
Growing Science
2022-01-01
|
Series: | Decision Science Letters |
Online Access: | http://www.growingscience.com/dsl/Vol11/dsl_2022_19.pdf |
Similar Items
-
Manufacturing runtime problem with an expedited fabrication rate, random failures, and scrap
by: Singa Wang Chiu, et al.
Published: (2020-01-01) -
The Collective Influence of Component Commonality, Adjustable-Rate, Postponement, and Rework on Multi-Item Manufacturing Decision
by: Singa Wang Chiu, et al.
Published: (2020-09-01) -
Optimizing an FPR-based supplier-retailer integrated problem with an outsourcer, rework, expedited rate, and probabilistic breakdown
by: Yuan-Shyi Peter Chiu, et al.
Published: (2022-01-01) -
Joint effects of stochastic machine failure, backorder of permissible shortage, rework, and scrap on stock replenishing decision
by: Yuan-Shyi Peter Chiu, et al.
Published: (2018-10-01) -
Optimization of a Multi-Product Intra-Supply Chain System with Failure in Rework.
by: Singa Wang Chiu, et al.
Published: (2016-01-01)