Peculiarities of mining and technical conditions for construction and operation of Kuznetskovskiy tunnel on the far eastern railway
Kuznetsovskiy tunnel is built in the pass section of Sikhote-Alin Ridge on the Pivan-Sovetskaya Gavan leg of the Far Eastern Railway route, Russia. The tunnel axis is crossed by a system of faults of various capacities. The fault zones are associated with increased fracturing, reduced stability, abu...
Main Authors: | Kvashuk Sergey, Smyshlyaev Boris, Trunev Vasiliy |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://www.matec-conferences.org/articles/matecconf/pdf/2019/14/matecconf_gccets2018_05016.pdf |
Similar Items
-
Tunneling methods used at the railway tunnels construction in Slovak republic
by: Jozef Čížik
Published: (2007-10-01) -
Increasing the performance of the Far Eastern Railway traction power supply system
by: N. P. Grigor’ev, et al.
Published: (2022-09-01) -
RETRACTED: Peculiarities of organizing rescue operations under adverse climatic conditions: Far Eastern Federal District
by: Yakovlev Valeriy
Published: (2023-01-01) -
Information-Based Construction of High-Speed Railway Tunnel
by: Qian Yang, et al.
Published: (2017-01-01) -
Geotechnical aspects of railway tunnel construction near rudoltice
by: Marian Drusa, et al.
Published: (2004-09-01)