Combined prediction model of truck multi-section travel time in open-pit mine based on velocity field
Due to the complexity of road in open-pit mine, the existing truck travel time prediction methods are difficult in the actual deployment. This leads to the truck optimal scheduling system only realizing scheduling instead of optimization. A combined prediction model of truck multi-section travel tim...
Main Authors: | , , , , , , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Industry and Mine Automation
2022-06-01
|
Series: | Gong-kuang zidonghua |
Subjects: | |
Online Access: | http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.17916 |
_version_ | 1797869021378379776 |
---|---|
author | TIAN Fengliang WANG Zhongxin SUN Xiaoyu XIN Fengyang SONG Bo WANG Jinjin ZENG Xiangyu ZHOU Hao ZHAO Ming |
author_facet | TIAN Fengliang WANG Zhongxin SUN Xiaoyu XIN Fengyang SONG Bo WANG Jinjin ZENG Xiangyu ZHOU Hao ZHAO Ming |
author_sort | TIAN Fengliang |
collection | DOAJ |
description | Due to the complexity of road in open-pit mine, the existing truck travel time prediction methods are difficult in the actual deployment. This leads to the truck optimal scheduling system only realizing scheduling instead of optimization. A combined prediction model of truck multi-section travel time in open pit mine based on velocity field is proposed. The open-pit mine road is divided into multiple road sections. the random forest algorithm is used to construct the unit prediction model to predict the travel time of the truck in each section. Then the predicted values of the unit prediction models are accumulated to obtain the travel time predicted value of the truck on in the composite road section. In order to improve the prediction precision, the average velocity of the truck is taken as an influence factor of the travel time. The velocity field is constructed according to the collected velocity information of the truck. The average value of the truck velocity at all points on a road section is calculated, which is approximate to the average velocity of the truck on the road section, and the average velocity is input into the unit prediction model. Based on the data of truck schedule information in truck dispatching system of Yimin Open-pit Mine, the combined prediction model is trained, and the prediction precision and real-time performance of the model are tested. The results show that the combined prediction model of truck travel time in multiple sections of open-pit mine based on velocity field has high prediction precision for truck travel time in composite road sections. The average absolute error percentage is 4.81%, which is more than 2% lower than the single prediction model based on random forest algorithm. The operation time of the combined prediction model is less than 1 s, which can realize the real-time prediction of truck travel time. |
first_indexed | 2024-04-10T00:06:06Z |
format | Article |
id | doaj.art-e1493f5372164f9bb32644e67e463de0 |
institution | Directory Open Access Journal |
issn | 1671-251X |
language | zho |
last_indexed | 2024-04-10T00:06:06Z |
publishDate | 2022-06-01 |
publisher | Editorial Department of Industry and Mine Automation |
record_format | Article |
series | Gong-kuang zidonghua |
spelling | doaj.art-e1493f5372164f9bb32644e67e463de02023-03-17T01:02:33ZzhoEditorial Department of Industry and Mine AutomationGong-kuang zidonghua1671-251X2022-06-014869599, 14610.13272/j.issn.1671-251x.17916Combined prediction model of truck multi-section travel time in open-pit mine based on velocity fieldTIAN Fengliang0WANG ZhongxinSUN Xiaoyu1XIN Fengyang2SONG Bo3WANG Jinjin4ZENG Xiangyu5ZHOU Hao6ZHAO Ming7CCTEG Shenyang Engineering Company, Shenyang 110015, ChinaSchool of Resources and Civil Engineering, Northeastern University, Shenyang 110015, ChinaCCTEG Shenyang Engineering Company, Shenyang 110015, ChinaCCTEG Shenyang Engineering Company, Shenyang 110015, ChinaCCTEG Shenyang Engineering Company, Shenyang 110015, ChinaCCTEG Shenyang Engineering Company, Shenyang 110015, ChinaCCTEG Shenyang Engineering Company, Shenyang 110015, ChinaCCTEG Shenyang Engineering Company, Shenyang 110015, ChinaDue to the complexity of road in open-pit mine, the existing truck travel time prediction methods are difficult in the actual deployment. This leads to the truck optimal scheduling system only realizing scheduling instead of optimization. A combined prediction model of truck multi-section travel time in open pit mine based on velocity field is proposed. The open-pit mine road is divided into multiple road sections. the random forest algorithm is used to construct the unit prediction model to predict the travel time of the truck in each section. Then the predicted values of the unit prediction models are accumulated to obtain the travel time predicted value of the truck on in the composite road section. In order to improve the prediction precision, the average velocity of the truck is taken as an influence factor of the travel time. The velocity field is constructed according to the collected velocity information of the truck. The average value of the truck velocity at all points on a road section is calculated, which is approximate to the average velocity of the truck on the road section, and the average velocity is input into the unit prediction model. Based on the data of truck schedule information in truck dispatching system of Yimin Open-pit Mine, the combined prediction model is trained, and the prediction precision and real-time performance of the model are tested. The results show that the combined prediction model of truck travel time in multiple sections of open-pit mine based on velocity field has high prediction precision for truck travel time in composite road sections. The average absolute error percentage is 4.81%, which is more than 2% lower than the single prediction model based on random forest algorithm. The operation time of the combined prediction model is less than 1 s, which can realize the real-time prediction of truck travel time.http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.17916open-pit minetruck optimal dispatchingtruck travel timecombined predictionvelocity fieldrandom forest algorithm |
spellingShingle | TIAN Fengliang WANG Zhongxin SUN Xiaoyu XIN Fengyang SONG Bo WANG Jinjin ZENG Xiangyu ZHOU Hao ZHAO Ming Combined prediction model of truck multi-section travel time in open-pit mine based on velocity field Gong-kuang zidonghua open-pit mine truck optimal dispatching truck travel time combined prediction velocity field random forest algorithm |
title | Combined prediction model of truck multi-section travel time in open-pit mine based on velocity field |
title_full | Combined prediction model of truck multi-section travel time in open-pit mine based on velocity field |
title_fullStr | Combined prediction model of truck multi-section travel time in open-pit mine based on velocity field |
title_full_unstemmed | Combined prediction model of truck multi-section travel time in open-pit mine based on velocity field |
title_short | Combined prediction model of truck multi-section travel time in open-pit mine based on velocity field |
title_sort | combined prediction model of truck multi section travel time in open pit mine based on velocity field |
topic | open-pit mine truck optimal dispatching truck travel time combined prediction velocity field random forest algorithm |
url | http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.17916 |
work_keys_str_mv | AT tianfengliang combinedpredictionmodeloftruckmultisectiontraveltimeinopenpitminebasedonvelocityfield AT wangzhongxin combinedpredictionmodeloftruckmultisectiontraveltimeinopenpitminebasedonvelocityfield AT sunxiaoyu combinedpredictionmodeloftruckmultisectiontraveltimeinopenpitminebasedonvelocityfield AT xinfengyang combinedpredictionmodeloftruckmultisectiontraveltimeinopenpitminebasedonvelocityfield AT songbo combinedpredictionmodeloftruckmultisectiontraveltimeinopenpitminebasedonvelocityfield AT wangjinjin combinedpredictionmodeloftruckmultisectiontraveltimeinopenpitminebasedonvelocityfield AT zengxiangyu combinedpredictionmodeloftruckmultisectiontraveltimeinopenpitminebasedonvelocityfield AT zhouhao combinedpredictionmodeloftruckmultisectiontraveltimeinopenpitminebasedonvelocityfield AT zhaoming combinedpredictionmodeloftruckmultisectiontraveltimeinopenpitminebasedonvelocityfield |