Combined prediction model of truck multi-section travel time in open-pit mine based on velocity field
Due to the complexity of road in open-pit mine, the existing truck travel time prediction methods are difficult in the actual deployment. This leads to the truck optimal scheduling system only realizing scheduling instead of optimization. A combined prediction model of truck multi-section travel tim...
Main Authors: | TIAN Fengliang, WANG Zhongxin, SUN Xiaoyu, XIN Fengyang, SONG Bo, WANG Jinjin, ZENG Xiangyu, ZHOU Hao, ZHAO Ming |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Department of Industry and Mine Automation
2022-06-01
|
Series: | Gong-kuang zidonghua |
Subjects: | |
Online Access: | http://www.gkzdh.cn/article/doi/10.13272/j.issn.1671-251x.17916 |
Similar Items
-
IMPROVING THE ORGANIZATION OF THE SHOVEL-TRUCK SYSTEMS IN OPEN-PIT COAL MINES
by: Mark KORYAGIN, et al.
Published: (2017-06-01) -
Current status and development trend of intelligent transportation technology in China's open-pit mines
by: WANG Zhongxin, et al.
Published: (2022-06-01) -
Truck Selection with the Fuzzy-WSM Method in Transportation Systems of Open Pit Mines
by: Tahir Malli, et al.
Published: (2021-01-01) -
Comparison of the various dispatching strategies for truck-shovel productivity optimization in open pit mines
by: Hossein Mirzaei-Nasirabad, et al.
Published: (2019-10-01) -
Periodic preventive maintenance strategy of open-pit mine truck based on age-reduction model
by: Wenjing LI, et al.
Published: (2023-04-01)