The Relationship between Cost Overruns and Modifications for Construction Projects: Spanish Public Works and Their Legal Framework
Cost overruns are a common problem for public works projects, often due to modifications to the original design. While the causes of these modifications have been studied, the legal framework’s impact and limitations on these modifications have received extensive treatment, with no specific case stu...
Main Authors: | Guillermo Alonso-Iglesias, Francisco Ortega-Fernández, Vicente Rodríguez-Montequín, Martin Skitmore, Olabode Emmanuel Ogunmakinde |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-10-01
|
Series: | Buildings |
Subjects: | |
Online Access: | https://www.mdpi.com/2075-5309/13/10/2626 |
Similar Items
-
Causes of Time and Cost Overrun: A Case Study of Health Sector Projects in Peshawar, KP
by: Shahnawaz Khan, et al.
Published: (2019-12-01) -
Risk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia
by: Saad Alshihri, et al.
Published: (2022-06-01) -
Unearthing Causative Factors of Cost Overrun on Ghanaian Road Projects
by: Opeoluwa Akinradewo, et al.
Published: (2022-12-01) -
Adaptation of a Cost Overrun Risk Prediction Model to the Type of Construction Facility
by: Edyta Plebankiewicz, et al.
Published: (2020-10-01) -
Minimizing Cost Overrun in Rail Projects through 5D-BIM: A Conceptual Governance Framework
by: Osama A. I. Hussain, et al.
Published: (2024-02-01)