The Relationship between Cost Overruns and Modifications for Construction Projects: Spanish Public Works and Their Legal Framework
Cost overruns are a common problem for public works projects, often due to modifications to the original design. While the causes of these modifications have been studied, the legal framework’s impact and limitations on these modifications have received extensive treatment, with no specific case stu...
Main Authors: | Guillermo Alonso-Iglesias, Francisco Ortega-Fernández, Vicente Rodríguez-Montequín, Martin Skitmore, Olabode Emmanuel Ogunmakinde |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-10-01
|
Series: | Buildings |
Subjects: | |
Online Access: | https://www.mdpi.com/2075-5309/13/10/2626 |
Similar Items
-
Causes of Time and Cost Overrun: A Case Study of Health Sector Projects in Peshawar, KP
by: Shahnawaz Khan, et al.
Published: (2019-12-01) -
Unearthing Causative Factors of Cost Overrun on Ghanaian Road Projects
by: Opeoluwa Akinradewo, et al.
Published: (2022-12-01) -
Risk Factors That Lead to Time and Cost Overruns of Building Projects in Saudi Arabia
by: Saad Alshihri, et al.
Published: (2022-06-01) -
Minimizing Cost Overrun in Rail Projects through 5D-BIM: A Conceptual Governance Framework
by: Osama A. I. Hussain, et al.
Published: (2024-02-01) -
Factors Leading to Cost Overrun Occurrence in Construction Projects
by: Mostafa El-Ahwal, et al.
Published: (2016-03-01)