Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu)
Construction of highway will increase the economy but it can’t be separated from risks. The purpose of this study is to analyze the risks at the stage of the implementation of highway construction and mitigation to minimize the negative impact. The study uses Descriptive Analysis and Analytical Hier...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
University of Brawijaya
2020-03-01
|
Series: | Rekayasa Sipil |
Subjects: | |
Online Access: | https://rekayasasipil.ub.ac.id/index.php/rs/article/view/592 |
_version_ | 1819067517308502016 |
---|---|
author | Nia Rahmawati Andi Tenrisukki Tenriajeng |
author_facet | Nia Rahmawati Andi Tenrisukki Tenriajeng |
author_sort | Nia Rahmawati |
collection | DOAJ |
description | Construction of highway will increase the economy but it can’t be separated from risks. The purpose of this study is to analyze the risks at the stage of the implementation of highway construction and mitigation to minimize the negative impact. The study uses Descriptive Analysis and Analytical Hierarchy Process in highway construction of Bekasi-Cawang-Kampung Melayu. Based on the result of analysis, the most dominant risk in aspect: 1)Politics:change of structure in government; 2)Environment: land acquisition; 3)Economy: owner’s late payment; 4)Finance:high overhead; 5)Nature: weather delay; 6)Project: material delivery delay; 7)Human: fatigue caused overtime; 8)Technical: nonconformity of volume in contract and reality; 9)Criminal: loss of materials and equipment; 10)Safety: lack of worker awareness. Then the dominant risk will be mitigated. |
first_indexed | 2024-12-21T16:19:31Z |
format | Article |
id | doaj.art-e18935fa04ee4d57b278fcade0032b1d |
institution | Directory Open Access Journal |
issn | 1978-5658 2502-6348 |
language | English |
last_indexed | 2024-12-21T16:19:31Z |
publishDate | 2020-03-01 |
publisher | University of Brawijaya |
record_format | Article |
series | Rekayasa Sipil |
spelling | doaj.art-e18935fa04ee4d57b278fcade0032b1d2022-12-21T18:57:36ZengUniversity of BrawijayaRekayasa Sipil1978-56582502-63482020-03-01141182510.21776/ub.rekayasasipil.2020.014.01.3426Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu)Nia Rahmawati0Andi Tenrisukki Tenriajeng1Universitas GunadarmaUniversitas GunadarmaConstruction of highway will increase the economy but it can’t be separated from risks. The purpose of this study is to analyze the risks at the stage of the implementation of highway construction and mitigation to minimize the negative impact. The study uses Descriptive Analysis and Analytical Hierarchy Process in highway construction of Bekasi-Cawang-Kampung Melayu. Based on the result of analysis, the most dominant risk in aspect: 1)Politics:change of structure in government; 2)Environment: land acquisition; 3)Economy: owner’s late payment; 4)Finance:high overhead; 5)Nature: weather delay; 6)Project: material delivery delay; 7)Human: fatigue caused overtime; 8)Technical: nonconformity of volume in contract and reality; 9)Criminal: loss of materials and equipment; 10)Safety: lack of worker awareness. Then the dominant risk will be mitigated.https://rekayasasipil.ub.ac.id/index.php/rs/article/view/592the level of riskdescriptive analysisanalytical hierarchy processrisk mitigation |
spellingShingle | Nia Rahmawati Andi Tenrisukki Tenriajeng Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu) Rekayasa Sipil the level of risk descriptive analysis analytical hierarchy process risk mitigation |
title | Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu) |
title_full | Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu) |
title_fullStr | Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu) |
title_full_unstemmed | Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu) |
title_short | Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu) |
title_sort | analisis manajemen risiko pelaksanaan pembangunan jalan tol studi kasus proyek pembangunan jalan tol bekasi cawang kampung melayu |
topic | the level of risk descriptive analysis analytical hierarchy process risk mitigation |
url | https://rekayasasipil.ub.ac.id/index.php/rs/article/view/592 |
work_keys_str_mv | AT niarahmawati analisismanajemenrisikopelaksanaanpembangunanjalantolstudikasusproyekpembangunanjalantolbekasicawangkampungmelayu AT anditenrisukkitenriajeng analisismanajemenrisikopelaksanaanpembangunanjalantolstudikasusproyekpembangunanjalantolbekasicawangkampungmelayu |