Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu)

Construction of highway will increase the economy but it can’t be separated from risks. The purpose of this study is to analyze the risks at the stage of the implementation of highway construction and mitigation to minimize the negative impact. The study uses Descriptive Analysis and Analytical Hier...

Full description

Bibliographic Details
Main Authors: Nia Rahmawati, Andi Tenrisukki Tenriajeng
Format: Article
Language:English
Published: University of Brawijaya 2020-03-01
Series:Rekayasa Sipil
Subjects:
Online Access:https://rekayasasipil.ub.ac.id/index.php/rs/article/view/592
_version_ 1819067517308502016
author Nia Rahmawati
Andi Tenrisukki Tenriajeng
author_facet Nia Rahmawati
Andi Tenrisukki Tenriajeng
author_sort Nia Rahmawati
collection DOAJ
description Construction of highway will increase the economy but it can’t be separated from risks. The purpose of this study is to analyze the risks at the stage of the implementation of highway construction and mitigation to minimize the negative impact. The study uses Descriptive Analysis and Analytical Hierarchy Process in highway construction of Bekasi-Cawang-Kampung Melayu. Based on the result of analysis, the most dominant risk in aspect: 1)Politics:change of structure in government; 2)Environment: land acquisition; 3)Economy: owner’s late payment; 4)Finance:high overhead; 5)Nature: weather delay; 6)Project: material delivery delay; 7)Human: fatigue caused overtime; 8)Technical: nonconformity of volume in contract and reality; 9)Criminal: loss of materials and equipment; 10)Safety: lack of worker awareness. Then the dominant risk will be mitigated.
first_indexed 2024-12-21T16:19:31Z
format Article
id doaj.art-e18935fa04ee4d57b278fcade0032b1d
institution Directory Open Access Journal
issn 1978-5658
2502-6348
language English
last_indexed 2024-12-21T16:19:31Z
publishDate 2020-03-01
publisher University of Brawijaya
record_format Article
series Rekayasa Sipil
spelling doaj.art-e18935fa04ee4d57b278fcade0032b1d2022-12-21T18:57:36ZengUniversity of BrawijayaRekayasa Sipil1978-56582502-63482020-03-01141182510.21776/ub.rekayasasipil.2020.014.01.3426Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu)Nia Rahmawati0Andi Tenrisukki Tenriajeng1Universitas GunadarmaUniversitas GunadarmaConstruction of highway will increase the economy but it can’t be separated from risks. The purpose of this study is to analyze the risks at the stage of the implementation of highway construction and mitigation to minimize the negative impact. The study uses Descriptive Analysis and Analytical Hierarchy Process in highway construction of Bekasi-Cawang-Kampung Melayu. Based on the result of analysis, the most dominant risk in aspect: 1)Politics:change of structure in government; 2)Environment: land acquisition; 3)Economy: owner’s late payment; 4)Finance:high overhead; 5)Nature: weather delay; 6)Project: material delivery delay; 7)Human: fatigue caused overtime; 8)Technical: nonconformity of volume in contract and reality; 9)Criminal: loss of materials and equipment; 10)Safety: lack of worker awareness. Then the dominant risk will be mitigated.https://rekayasasipil.ub.ac.id/index.php/rs/article/view/592the level of riskdescriptive analysisanalytical hierarchy processrisk mitigation
spellingShingle Nia Rahmawati
Andi Tenrisukki Tenriajeng
Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu)
Rekayasa Sipil
the level of risk
descriptive analysis
analytical hierarchy process
risk mitigation
title Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu)
title_full Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu)
title_fullStr Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu)
title_full_unstemmed Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu)
title_short Analisis Manajemen Risiko Pelaksanaan Pembangunan Jalan Tol (Studi Kasus : Proyek Pembangunan Jalan Tol Bekasi - Cawang - Kampung Melayu)
title_sort analisis manajemen risiko pelaksanaan pembangunan jalan tol studi kasus proyek pembangunan jalan tol bekasi cawang kampung melayu
topic the level of risk
descriptive analysis
analytical hierarchy process
risk mitigation
url https://rekayasasipil.ub.ac.id/index.php/rs/article/view/592
work_keys_str_mv AT niarahmawati analisismanajemenrisikopelaksanaanpembangunanjalantolstudikasusproyekpembangunanjalantolbekasicawangkampungmelayu
AT anditenrisukkitenriajeng analisismanajemenrisikopelaksanaanpembangunanjalantolstudikasusproyekpembangunanjalantolbekasicawangkampungmelayu