The Risk Analysis of Andalas University Hospital Construction Project

Construction project activities have various risks during their implementation. Every work item on the project has different levels of risk and can affect the project so that it will have an impact on increasing cost and time of project completion. PT. Adhi Karya Tbk is carrying out the project of A...

Full description

Bibliographic Details
Main Authors: Zaidir, Putri Melani Novia, Hasan Alizar
Format: Article
Language:English
Published: EDP Sciences 2018-01-01
Series:MATEC Web of Conferences
Online Access:https://doi.org/10.1051/matecconf/201821501033
_version_ 1818929522592972800
author Zaidir
Putri Melani Novia
Hasan Alizar
author_facet Zaidir
Putri Melani Novia
Hasan Alizar
author_sort Zaidir
collection DOAJ
description Construction project activities have various risks during their implementation. Every work item on the project has different levels of risk and can affect the project so that it will have an impact on increasing cost and time of project completion. PT. Adhi Karya Tbk is carrying out the project of Andalas University Hospital, where in its implementation there will be many possibilities of risks that will occur. Therefore, it is necessary to identify and analyze the variables of risks that may occur as well as proposing appropriate risk mitigation measures for minimize the potential risks. Risk identification and risk analysis were done using Risk Breakdown Structure (RBS) and Analytic Hierarchy Process (AHP) method respectively. Based on data compilation, variables of risk are grouped in 4 types, namely risk of engineering consist of 8 variables, risk of production consist of 5 variables, risk of construction consist of 9 variables and risk of financial consist of 2 variable, with total of risk are 24 variables. Risk analysis with AHP method is obtained 5 (five) risk priority based on the highest value on each risk type. The five priority risks were a risks of increasing of material prices (extreme), a risk of increasing of procurement costs (high), workplace accidents risk in the project area (medium), mistaken translating the DED to shop drawing (medium) and a quality of goods and services produced by vendors not meet the specifications in contract (medium). To reduce the possibility and impact the risks posed mitigation measures for the risk priority highest were proposed.
first_indexed 2024-12-20T03:46:09Z
format Article
id doaj.art-e1c09a44f4194f719e2602aa2f94be42
institution Directory Open Access Journal
issn 2261-236X
language English
last_indexed 2024-12-20T03:46:09Z
publishDate 2018-01-01
publisher EDP Sciences
record_format Article
series MATEC Web of Conferences
spelling doaj.art-e1c09a44f4194f719e2602aa2f94be422022-12-21T19:54:37ZengEDP SciencesMATEC Web of Conferences2261-236X2018-01-012150103310.1051/matecconf/201821501033matecconf_ictis2018_01033The Risk Analysis of Andalas University Hospital Construction ProjectZaidir0Putri Melani Novia1Hasan Alizar2Andalas University, Department of Civil EngineeringAndalas University, Department of Industrial EngineeringAndalas University, Department of Industrial EngineeringConstruction project activities have various risks during their implementation. Every work item on the project has different levels of risk and can affect the project so that it will have an impact on increasing cost and time of project completion. PT. Adhi Karya Tbk is carrying out the project of Andalas University Hospital, where in its implementation there will be many possibilities of risks that will occur. Therefore, it is necessary to identify and analyze the variables of risks that may occur as well as proposing appropriate risk mitigation measures for minimize the potential risks. Risk identification and risk analysis were done using Risk Breakdown Structure (RBS) and Analytic Hierarchy Process (AHP) method respectively. Based on data compilation, variables of risk are grouped in 4 types, namely risk of engineering consist of 8 variables, risk of production consist of 5 variables, risk of construction consist of 9 variables and risk of financial consist of 2 variable, with total of risk are 24 variables. Risk analysis with AHP method is obtained 5 (five) risk priority based on the highest value on each risk type. The five priority risks were a risks of increasing of material prices (extreme), a risk of increasing of procurement costs (high), workplace accidents risk in the project area (medium), mistaken translating the DED to shop drawing (medium) and a quality of goods and services produced by vendors not meet the specifications in contract (medium). To reduce the possibility and impact the risks posed mitigation measures for the risk priority highest were proposed.https://doi.org/10.1051/matecconf/201821501033
spellingShingle Zaidir
Putri Melani Novia
Hasan Alizar
The Risk Analysis of Andalas University Hospital Construction Project
MATEC Web of Conferences
title The Risk Analysis of Andalas University Hospital Construction Project
title_full The Risk Analysis of Andalas University Hospital Construction Project
title_fullStr The Risk Analysis of Andalas University Hospital Construction Project
title_full_unstemmed The Risk Analysis of Andalas University Hospital Construction Project
title_short The Risk Analysis of Andalas University Hospital Construction Project
title_sort risk analysis of andalas university hospital construction project
url https://doi.org/10.1051/matecconf/201821501033
work_keys_str_mv AT zaidir theriskanalysisofandalasuniversityhospitalconstructionproject
AT putrimelaninovia theriskanalysisofandalasuniversityhospitalconstructionproject
AT hasanalizar theriskanalysisofandalasuniversityhospitalconstructionproject
AT zaidir riskanalysisofandalasuniversityhospitalconstructionproject
AT putrimelaninovia riskanalysisofandalasuniversityhospitalconstructionproject
AT hasanalizar riskanalysisofandalasuniversityhospitalconstructionproject