Measures for controlling large deformations of underground caverns under high in-situ stress condition – A case study of Jinping I hydropower station
The Jinping I hydropower station is a huge water conservancy project consisting of the highest concrete arch dam to date in the world and a highly complex and large underground powerhouse cavern. It is located on the right bank with extremely high in-situ stress and a few discontinuities observed in...
Main Authors: | Shengwu Song, Xuemin Feng, Chenggang Liao, Dewen Cai, Zhongxu Liu, Yunhao Yang |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2016-10-01
|
Series: | Journal of Rock Mechanics and Geotechnical Engineering |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1674775516300750 |
Similar Items
-
Long-term stability analysis of the left bank abutment slope at Jinping I hydropower station
by: Long Zhang, et al.
Published: (2016-06-01) -
Intelligent Stability Design of Large Underground Hydraulic Caverns: Chinese Method and Practice
by: Xiating Feng, et al.
Published: (2011-10-01) -
Key technologies and risk management of deep tunnel construction at Jinping II hydropower station
by: Chunsheng Zhang, et al.
Published: (2016-08-01) -
Spatiotemporal Impact on Vegetation by Tunnel Discharging in the Jinping II Hydropower Station: Evidence From the NDVI and GPP Monitoring Dataset of 2001–2019
by: Ci Song, et al.
Published: (2022-05-01) -
Determination of convergence of underground gas storage caverns using non-invasive methodology based on land surface subsidence measurement
by: Rafał Misa, et al.
Published: (2023-08-01)