Construction Methods and Lessons Learned for a Non-Proprietary Ultra-High Performance Concrete Overlay
The work presented in this paper includes the construction methods and lessons learned from the placement of a non-proprietary ultra-high performance concrete (UHPC) overlay through the rehabilitation of a concrete bridge deck located in Socorro, New Mexico, USA. The selected bridge is a multi-cell,...
Main Authors: | Andres Alvarez, William K. Toledo, Brad D. Weldon, Craig M. Newtson |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2024-02-01
|
Series: | Construction Materials |
Subjects: | |
Online Access: | https://www.mdpi.com/2673-7108/4/1/15 |
Similar Items
-
Development and characterization of non-proprietary ultra high performance concrete
by: Muhammad Azhar Saleem, et al.
Published: (2024-01-01) -
Concrete bridge deck overlay assessment using ultrasonic tomography
by: Tristan Sanderson, et al.
Published: (2022-06-01) -
Experimental Behavior of Precast Bridge Deck Systems with Non-Proprietary UHPC Transverse Field Joints
by: Mohamed Abokifa, et al.
Published: (2021-11-01) -
Synergetic effect of viscosity modifying admixtures and polycarboxylate ether superplasticizer on key characteristics of thixotropic UHPC for bonded bridge deck overlay rehabilitation
by: Le Teng, et al.
Published: (2024-07-01) -
Bonded Concrete Overlays: A Brief Discussion on Restrained Shrinkage Deformations and Their Prediction Models
by: Cyron Wojciech, et al.
Published: (2019-12-01)