Developing model of toll road traffic forecasting during ramp-up period
The Feasibility of Toll Road project investment that uses Public Private Partnership (PPP) scheme is largely determined by the accuracy of traffic forecasting as a reflection of revenue streams. The accuracy level of traffic forecasting is needed to get a description of risks and uncertainty of Toll...
Main Authors: | Indra Dharmawan Weka, Sjafruddin Ade, Bona Frazila Russ, Zukhruf Febri |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2019-01-01
|
Series: | MATEC Web of Conferences |
Online Access: | https://www.matec-conferences.org/articles/matecconf/pdf/2019/19/matecconf_concern2018_03016.pdf |
Similar Items
-
Commuter Travelers' Perception of Toll Roads During the Ramp-Up Period in Indonesia
by: Weka Indra Dharmawan, et al.
Published: (2023-12-01) -
Model Optimasi untuk Restorasi Jaringan Jalan Terdampak Bencana
by: Febri Zukhruf, et al.
Published: (2020-12-01) -
Exploring physical attributes of walkability from perspective of blind pedestrians
by: Bona Frazila Russ, et al.
Published: (2018-01-01) -
Modelling the Impact of Travel Time Uncertainty to the Cocoa Supply Chain Network
by: Febri Zukhruf, et al.
Published: (2018-04-01) -
A Comparative Study on Swarm-based Algorithms to Solve the Stochastic Optimization Problem in Container Terminal Design
by: Febri Zukhruf, et al.
Published: (2020-04-01)