How to front the physical distancing requirement within workforce scheduling: empirical investigation through an optimization model
This work is focused on workforce scheduling for assembly lines with the additional constraint of workforce distancing. The aim is to warrant the necessary safety and health requirements due to COVID-19. The research stems within an industrial case in which a methodology has been developed with the...
Main Authors: | Riccio Carlo, Menanno Marialuisa, Savino Matteo M. |
---|---|
Format: | Article |
Language: | English |
Published: |
Taylor & Francis Group
2022-12-01
|
Series: | Production and Manufacturing Research: An Open Access Journal |
Subjects: | |
Online Access: | https://www.tandfonline.com/doi/10.1080/21693277.2022.2097139 |
Similar Items
-
Ergonomic workforce scheduling under complex worker limitation and task requirements:
by: Tanuchporn Wongwien, et al.
Published: (2012-11-01) -
Multi-skilled workforce scheduling with training and welfare considerations
by: Peña Diana A., et al.
Published: (2023-09-01) -
Optimizing workforce reliability using shift scheduling
by: mohammad akbari
Published: (2019-09-01) -
Workforce scheduling efficiency assessment in construction projects through a multi-objective optimization model in the COVID-19 context
by: Federico Corral, et al.
Published: (2023-06-01) -
IT Workforce
by: Wiesche, Manuel, et al.
Published: (2021)