Dynamic Work Planning by Using Simulation-based Optimization in Consideration of Workers’ Skill and Training
High-skill tasks such as aircraft maintenance procedures generally require considerable on-the-job training (OJT). Because OJT requires a considerable amount of time, long-term scheduling of OJT by considering both working efficiency and skill development is required. The authors have proposed educa...
Main Authors: | Takeshi TATEYAMA, Toshitake TATENO, Keiko SHIMIZU |
---|---|
Format: | Article |
Language: | English |
Published: |
The Japan Society of Mechanical Engineers
2010-06-01
|
Series: | Journal of Advanced Mechanical Design, Systems, and Manufacturing |
Subjects: | |
Online Access: | https://www.jstage.jst.go.jp/article/jamdsm/4/3/4_3_597/_pdf/-char/en |
Similar Items
-
A scheduling support system for large-scale facilities using reinforcement learning in consideration of skill educations and working conditions
by: Takeshi TATEYAMA, et al.
Published: (2014-10-01) -
Work Scheduling by Use of Worker Model in Consideration of Learning by On-The-Job Training
by: Toshitake TATENO, et al.
Published: (2007-07-01) -
PENGARUH PELAKSANAAN OJT (ON THE JOB TRAINING) DAN PERAN ORANGTUA TERHADAP MINAT BERWIRAUSAHA PADA SISWA KELAS XII KOMPETENSI KEAHLIAN AKUNTANSI DI SMK NEGERI 2 SEMARANG TAHUN AJARAN 2013/2014
by: Siti Mutmainah
Published: (2013-11-01) -
EFEKTIVITAS MODEL AMOVIE UNTUK MENINGKATKAN KEMAMPUAN TEACHERPRENEUR
by: Endang Mulyatiningsih
Published: (2016-11-01) -
VALIDITY OF INSTRUMENTS AS MEASURING INSTRUMENT EVALUATION PROGRAM ON THE JOB TRAINING STUDENTS SMK NEGERI 1 CARIU BOGOR REGENCY
by: Sefrianto, et al.
Published: (2020-08-01)