Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC Method
One of the construction processes with high potential for danger is driven pile foundation work. Driven pile foundation work has a series of processes that are quite dangerous if not executed properly due complicated work process. This study aims to identify hazards and provide efforts to control ha...
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2023-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/25/e3sconf_icobar2023_01004.pdf |
_version_ | 1797808024804392960 |
---|---|
author | Liandar Stefani Putra Andi Bayu Prahara Eduardi |
author_facet | Liandar Stefani Putra Andi Bayu Prahara Eduardi |
author_sort | Liandar Stefani |
collection | DOAJ |
description | One of the construction processes with high potential for danger is driven pile foundation work. Driven pile foundation work has a series of processes that are quite dangerous if not executed properly due complicated work process. This study aims to identify hazards and provide efforts to control hazards using the HIRARC method. Based on the results of the study, 42 potential hazards were identified, with 21 possible hazards at a low level, and 21 possible hazards at a moderate level. Risk controls are carried out by checking the equipment before use, checking the feasibility of SIA and SIO to ensure operator competence, clearing the work area from unauthorized workers other than the operator of heavy equipment and helper(s), providing barricades and warning signs in the work area, using essential PPE and additional PPE, and good coordination and communication with all workers involved in driven pile foundation work. Several suggestions are everyone that is in charge of work must be firm in penalties, all work tools must be checked carefully and periodically, and PPE providers must provide essential and additional PPE for specialized jobs. For future research we can suggest continue discussion regarding the operational control, cost budget plan, and evaluation and review of SHE performance. |
first_indexed | 2024-03-13T06:31:24Z |
format | Article |
id | doaj.art-e40552b830084fbbb7f3a6a0c685f90d |
institution | Directory Open Access Journal |
issn | 2267-1242 |
language | English |
last_indexed | 2024-03-13T06:31:24Z |
publishDate | 2023-01-01 |
publisher | EDP Sciences |
record_format | Article |
series | E3S Web of Conferences |
spelling | doaj.art-e40552b830084fbbb7f3a6a0c685f90d2023-06-09T09:07:06ZengEDP SciencesE3S Web of Conferences2267-12422023-01-013880100410.1051/e3sconf/202338801004e3sconf_icobar2023_01004Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC MethodLiandar Stefani0Putra Andi Bayu1Prahara Eduardi2Civil Engineering Department, Faculty of Engineering, 11480 Bina Nusantara UniversityCivil Engineering Department, Faculty of Engineering, 11480 Bina Nusantara UniversityCivil Engineering Department, Faculty of Engineering, 11480 Bina Nusantara UniversityOne of the construction processes with high potential for danger is driven pile foundation work. Driven pile foundation work has a series of processes that are quite dangerous if not executed properly due complicated work process. This study aims to identify hazards and provide efforts to control hazards using the HIRARC method. Based on the results of the study, 42 potential hazards were identified, with 21 possible hazards at a low level, and 21 possible hazards at a moderate level. Risk controls are carried out by checking the equipment before use, checking the feasibility of SIA and SIO to ensure operator competence, clearing the work area from unauthorized workers other than the operator of heavy equipment and helper(s), providing barricades and warning signs in the work area, using essential PPE and additional PPE, and good coordination and communication with all workers involved in driven pile foundation work. Several suggestions are everyone that is in charge of work must be firm in penalties, all work tools must be checked carefully and periodically, and PPE providers must provide essential and additional PPE for specialized jobs. For future research we can suggest continue discussion regarding the operational control, cost budget plan, and evaluation and review of SHE performance.https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/25/e3sconf_icobar2023_01004.pdf |
spellingShingle | Liandar Stefani Putra Andi Bayu Prahara Eduardi Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC Method E3S Web of Conferences |
title | Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC Method |
title_full | Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC Method |
title_fullStr | Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC Method |
title_full_unstemmed | Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC Method |
title_short | Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC Method |
title_sort | hazard and risk analysis of driven pile foundation works using hirarc method |
url | https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/25/e3sconf_icobar2023_01004.pdf |
work_keys_str_mv | AT liandarstefani hazardandriskanalysisofdrivenpilefoundationworksusinghirarcmethod AT putraandibayu hazardandriskanalysisofdrivenpilefoundationworksusinghirarcmethod AT praharaeduardi hazardandriskanalysisofdrivenpilefoundationworksusinghirarcmethod |