Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC Method

One of the construction processes with high potential for danger is driven pile foundation work. Driven pile foundation work has a series of processes that are quite dangerous if not executed properly due complicated work process. This study aims to identify hazards and provide efforts to control ha...

Full description

Bibliographic Details
Main Authors: Liandar Stefani, Putra Andi Bayu, Prahara Eduardi
Format: Article
Language:English
Published: EDP Sciences 2023-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/25/e3sconf_icobar2023_01004.pdf
_version_ 1797808024804392960
author Liandar Stefani
Putra Andi Bayu
Prahara Eduardi
author_facet Liandar Stefani
Putra Andi Bayu
Prahara Eduardi
author_sort Liandar Stefani
collection DOAJ
description One of the construction processes with high potential for danger is driven pile foundation work. Driven pile foundation work has a series of processes that are quite dangerous if not executed properly due complicated work process. This study aims to identify hazards and provide efforts to control hazards using the HIRARC method. Based on the results of the study, 42 potential hazards were identified, with 21 possible hazards at a low level, and 21 possible hazards at a moderate level. Risk controls are carried out by checking the equipment before use, checking the feasibility of SIA and SIO to ensure operator competence, clearing the work area from unauthorized workers other than the operator of heavy equipment and helper(s), providing barricades and warning signs in the work area, using essential PPE and additional PPE, and good coordination and communication with all workers involved in driven pile foundation work. Several suggestions are everyone that is in charge of work must be firm in penalties, all work tools must be checked carefully and periodically, and PPE providers must provide essential and additional PPE for specialized jobs. For future research we can suggest continue discussion regarding the operational control, cost budget plan, and evaluation and review of SHE performance.
first_indexed 2024-03-13T06:31:24Z
format Article
id doaj.art-e40552b830084fbbb7f3a6a0c685f90d
institution Directory Open Access Journal
issn 2267-1242
language English
last_indexed 2024-03-13T06:31:24Z
publishDate 2023-01-01
publisher EDP Sciences
record_format Article
series E3S Web of Conferences
spelling doaj.art-e40552b830084fbbb7f3a6a0c685f90d2023-06-09T09:07:06ZengEDP SciencesE3S Web of Conferences2267-12422023-01-013880100410.1051/e3sconf/202338801004e3sconf_icobar2023_01004Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC MethodLiandar Stefani0Putra Andi Bayu1Prahara Eduardi2Civil Engineering Department, Faculty of Engineering, 11480 Bina Nusantara UniversityCivil Engineering Department, Faculty of Engineering, 11480 Bina Nusantara UniversityCivil Engineering Department, Faculty of Engineering, 11480 Bina Nusantara UniversityOne of the construction processes with high potential for danger is driven pile foundation work. Driven pile foundation work has a series of processes that are quite dangerous if not executed properly due complicated work process. This study aims to identify hazards and provide efforts to control hazards using the HIRARC method. Based on the results of the study, 42 potential hazards were identified, with 21 possible hazards at a low level, and 21 possible hazards at a moderate level. Risk controls are carried out by checking the equipment before use, checking the feasibility of SIA and SIO to ensure operator competence, clearing the work area from unauthorized workers other than the operator of heavy equipment and helper(s), providing barricades and warning signs in the work area, using essential PPE and additional PPE, and good coordination and communication with all workers involved in driven pile foundation work. Several suggestions are everyone that is in charge of work must be firm in penalties, all work tools must be checked carefully and periodically, and PPE providers must provide essential and additional PPE for specialized jobs. For future research we can suggest continue discussion regarding the operational control, cost budget plan, and evaluation and review of SHE performance.https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/25/e3sconf_icobar2023_01004.pdf
spellingShingle Liandar Stefani
Putra Andi Bayu
Prahara Eduardi
Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC Method
E3S Web of Conferences
title Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC Method
title_full Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC Method
title_fullStr Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC Method
title_full_unstemmed Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC Method
title_short Hazard and Risk Analysis of Driven Pile Foundation Works Using HIRARC Method
title_sort hazard and risk analysis of driven pile foundation works using hirarc method
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2023/25/e3sconf_icobar2023_01004.pdf
work_keys_str_mv AT liandarstefani hazardandriskanalysisofdrivenpilefoundationworksusinghirarcmethod
AT putraandibayu hazardandriskanalysisofdrivenpilefoundationworksusinghirarcmethod
AT praharaeduardi hazardandriskanalysisofdrivenpilefoundationworksusinghirarcmethod