IMPROVING WELL CONSTRUCTION EFFICIENCY IN THE CON-TEXT OF DRILLING A WELLBORE AND A PAY ZONE: PRIMARY AND SECONDARY DRILLING

This article is devoted to the features of improving well construction efficiency, namely, the stationary problem of incompressible fluid inflow into a complex-geometry well. This problem is solved in two dimensions: infinite vertical permeability and zero vertical permeability of formation. We ha...

Full description

Bibliographic Details
Main Authors: Olga, Ashot, Evgeniy
Format: Article
Language:English
Published: Zibeline International 2018-07-01
Series:Journal of Mechanical Engineering Research and Developments
Subjects:
_version_ 1818145751489839104
author Olga
Ashot
Evgeniy
author_facet Olga
Ashot
Evgeniy
author_sort Olga
collection DOAJ
description This article is devoted to the features of improving well construction efficiency, namely, the stationary problem of incompressible fluid inflow into a complex-geometry well. This problem is solved in two dimensions: infinite vertical permeability and zero vertical permeability of formation. We have also measured the increase in the flowing well flow rate in the context of forming long (up to three meters) filtration channels with drills. Currently, there are no effec-tive technologies in this area. Thus, our paper is relevant and significant. This study allows us to conclude that using the proposed drill allows making maximum depth filtration channels.
first_indexed 2024-12-11T12:08:26Z
format Article
id doaj.art-e526f08da35541ebbb0120a1e4de0ff4
institution Directory Open Access Journal
issn 1024-1752
language English
last_indexed 2024-12-11T12:08:26Z
publishDate 2018-07-01
publisher Zibeline International
record_format Article
series Journal of Mechanical Engineering Research and Developments
spelling doaj.art-e526f08da35541ebbb0120a1e4de0ff42022-12-22T01:07:52ZengZibeline InternationalJournal of Mechanical Engineering Research and Developments1024-17522018-07-01412283010.26480/jmerd.02.2018.28.30IMPROVING WELL CONSTRUCTION EFFICIENCY IN THE CON-TEXT OF DRILLING A WELLBORE AND A PAY ZONE: PRIMARY AND SECONDARY DRILLINGOlga0 Ashot 1Evgeniy 2SavenokArutyunyanPetrushinThis article is devoted to the features of improving well construction efficiency, namely, the stationary problem of incompressible fluid inflow into a complex-geometry well. This problem is solved in two dimensions: infinite vertical permeability and zero vertical permeability of formation. We have also measured the increase in the flowing well flow rate in the context of forming long (up to three meters) filtration channels with drills. Currently, there are no effec-tive technologies in this area. Thus, our paper is relevant and significant. This study allows us to conclude that using the proposed drill allows making maximum depth filtration channels.Pay ZoneZero PermeabilityIncompressible FluidWell
spellingShingle Olga
Ashot
Evgeniy
IMPROVING WELL CONSTRUCTION EFFICIENCY IN THE CON-TEXT OF DRILLING A WELLBORE AND A PAY ZONE: PRIMARY AND SECONDARY DRILLING
Journal of Mechanical Engineering Research and Developments
Pay Zone
Zero Permeability
Incompressible Fluid
Well
title IMPROVING WELL CONSTRUCTION EFFICIENCY IN THE CON-TEXT OF DRILLING A WELLBORE AND A PAY ZONE: PRIMARY AND SECONDARY DRILLING
title_full IMPROVING WELL CONSTRUCTION EFFICIENCY IN THE CON-TEXT OF DRILLING A WELLBORE AND A PAY ZONE: PRIMARY AND SECONDARY DRILLING
title_fullStr IMPROVING WELL CONSTRUCTION EFFICIENCY IN THE CON-TEXT OF DRILLING A WELLBORE AND A PAY ZONE: PRIMARY AND SECONDARY DRILLING
title_full_unstemmed IMPROVING WELL CONSTRUCTION EFFICIENCY IN THE CON-TEXT OF DRILLING A WELLBORE AND A PAY ZONE: PRIMARY AND SECONDARY DRILLING
title_short IMPROVING WELL CONSTRUCTION EFFICIENCY IN THE CON-TEXT OF DRILLING A WELLBORE AND A PAY ZONE: PRIMARY AND SECONDARY DRILLING
title_sort improving well construction efficiency in the con text of drilling a wellbore and a pay zone primary and secondary drilling
topic Pay Zone
Zero Permeability
Incompressible Fluid
Well
work_keys_str_mv AT olga improvingwellconstructionefficiencyinthecontextofdrillingawellboreandapayzoneprimaryandsecondarydrilling
AT ashot improvingwellconstructionefficiencyinthecontextofdrillingawellboreandapayzoneprimaryandsecondarydrilling
AT evgeniy improvingwellconstructionefficiencyinthecontextofdrillingawellboreandapayzoneprimaryandsecondarydrilling