Industrial-size job shop scheduling with constraint programming
The job shop scheduling problem is one of the most studied optimization problems to this day and it becomes more and more important in the light of the fourth industrial revolution (Industry 4.0) that aims at fully automated production processes. For a long time exact methods like constraint program...
Main Authors: | Giacomo Da Col, Erich C. Teppan |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2022-01-01
|
Series: | Operations Research Perspectives |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2214716022000215 |
Similar Items
-
Constraint programing for solving four complex flexible shop scheduling problems
by: Leilei Meng, et al.
Published: (2021-06-01) -
Investigation of Flexible Job Shop with Machine Availability Constraints
by: Nurul Izah Anuar, et al.
Published: (2024-03-01) -
A Constraint Programming Formulation of the Multi-Mode Resource-Constrained Project Scheduling Problem for the Flexible Job Shop Scheduling Problem
by: Francisco Yuraszeck, et al.
Published: (2023-01-01) -
Mathematical Programming vs. Constraint Programming for Scheduling Problems
by: Ludmila Janosikova, et al.
Published: (2013-03-01) -
Constraint Programming for Flexible Flow Shop Scheduling Problem with Repeated Jobs and Repeated Operations
by: Kateryna Czerniachowska, et al.
Published: (2023-06-01)