An Inverse Optimal Value Approach for Synchronously Optimizing Activity Durations and Worker Assignments with a Project Ideal Cost
Most companies survive the pain of cost and schedule overruns because of inaccurate project activity time settings. In order to deliver a project with a target cost and on schedule, this research proposes an inverse optimal value approach to optimize activity durations and the corresponding worker a...
Main Authors: | Lili Zhang, Zhengrui Chen, Dan Shi, Yanan Zhao |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2023-02-01
|
Series: | Mathematics |
Subjects: | |
Online Access: | https://www.mdpi.com/2227-7390/11/5/1178 |
Similar Items
-
Robust optimization for U-shaped assembly line worker assignment and balancing problem with uncertain task times
by: Ömer Faruk Yılmaz
Published: (2020-01-01) -
Optimal waypoint assignment for designing drone light show formations
by: Dharna Nar, et al.
Published: (2022-12-01) -
Optimal assignment of infrastructure construction workers
by: Wen Yi, et al.
Published: (2022-09-01) -
Solving the Dynamic Weapon Target Assignment Problem by an Improved Multiobjective Particle Swarm Optimization Algorithm
by: Lingren Kong, et al.
Published: (2021-10-01) -
Assembly Line Worker Assignment and Balancing Problem by Considering Labor Cost
by: Hamid YILMAZ
Published: (2022-06-01)