Method of rescheduling for hybrid production lines with intermediate buffers
A method of creating production schedules regarding production lines with parallel machines is presented. The production line setup provides for intermediate buffers located between individual stages. The method mostly concerns situations when part of the production machines is unavailable for perfo...
Main Author: | Marek, Magiera |
---|---|
Format: | Article |
Language: | English |
Published: |
Polish Academy of Sciences
2020-06-01
|
Series: | Archives of Control Sciences |
Subjects: | |
Online Access: | https://journals.pan.pl/Content/116645/PDF/art02.pdf |
Similar Items
-
Minimizing Makespan in Distributed Blocking Flowshops Using Hybrid Iterated Greedy Algorithms
by: Kuo-Ching Ying, et al.
Published: (2017-01-01) -
Quantification of Opioid Prescription Practice Changes Due to Hydrocodone Combination Product Rescheduling in an Academic Pain Clinic
by: Ngo J, et al.
Published: (2020-08-01) -
Perencanaan Scheduling dan Rescheduling dengan Metode Heuristic SPT Guna Meminimumkan Mean Tardiness dan Makespan
by: Eti Kristinawati
Published: (2010-04-01) -
Managing Disruptions in a Flow-Shop Manufacturing System
by: Ajay Surendrarao Bhongade, et al.
Published: (2023-04-01) -
Algorithms Using List Scheduling and Greedy Strategies for Scheduling in the Flowshop with Resource Constraints
by: Ewa Figielska
Published: (2014-12-01)