A Crew Scheduling Model to Incrementally Optimize Workforce Assignments for Offshore Wind Farm Constructions
In the literature, different authors attribute between 15% to 30% of a wind farm’s costs to logistics during the installation, e.g., for vessels or personnel. Currently, there exist only a few approaches for crew scheduling in the offshore area. However, current approaches only satisfy subsets of th...
Main Authors: | Daniel Rippel, Fatemeh Abasian Foroushani, Michael Lütjen, Michael Freitag |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-10-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/14/21/6963 |
Similar Items
-
Evaluation of Loading Bay Restrictions for the Installation of Offshore Wind Farms Using a Combination of Mixed-Integer Linear Programming and Model Predictive Control
by: Daniel Rippel, et al.
Published: (2019-11-01) -
An integrated model for aircraft routing and crew scheduling: Lagrangian Relaxation and metaheuristic algorithm
by: Masoumeh Mirjafari, et al.
Published: (2020-01-01) -
Characteristics and Applicability Analysis of Flexible Scheduling for Urban Rail Transit Crews
by: Tianjie XU
Published: (2024-02-01) -
Combined Optimization of Maintenance Works and Crews in Railway Networks
by: Nikoletta Gkonou, et al.
Published: (2023-09-01) -
Integrated Crew Scheduling and Roster Problem for Trainmasters of Passenger Railway Transportation
by: Dung-Ying Lin, et al.
Published: (2019-01-01)