Summary: | This paper presents the results of energetic planning phase of the management standard NC ISO 50001 implemented in a telecommunications company. It was made taking into account the requirements set by existing regulations and key issues were determined such as the institution’s policy regarding energy, scopes and limits; legal requirements were compiled as well as the functions applicable to the senior management of the company together with the work team. The scope of the research is the energy planning phase and two methodologies present in specialized literature will be applied in this area. As a result of theenergy related review the areas or equipment of significant energy use (SEnUs) of each transmission center selected were identified; potential savings and number of Energy indicators for performance evaluation were also identified. Moreover, it was estimated that measures to improve energy represent potential savings up to 30,299 CUC/ year.
|