A simple formulation for early-stage cost estimation of building construction projects
This study is aimed at improving a formula that enables easy, correct, and fast estimation of an Early-Stage Cost of Buildings (ESCE). This formula, enabling estimation of ESCE, was developed by the authors based on artificial neural networks and gene expression programming. A quantity survey was co...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Croatian Association of Civil Engineers
2021-09-01
|
Series: | Građevinar |
Subjects: | |
Online Access: | https://doi.org/10.14256/JCE.3013.2020 |
_version_ | 1819274654194335744 |
---|---|
author | Esra Dobrucali Ismail Hakki Demir |
author_facet | Esra Dobrucali Ismail Hakki Demir |
author_sort | Esra Dobrucali |
collection | DOAJ |
description | This study is aimed at improving a formula that enables easy, correct, and fast estimation of an Early-Stage Cost of Buildings (ESCE). This formula, enabling estimation of ESCE, was developed by the authors based on artificial neural networks and gene expression programming. A quantity survey was conducted for a hundred construction projects, and a data set was created. This data set was analysed with many Artificial Neural Networks to determine the variables that affect ESCE. An algorithm configuration was made with Gene Expression Programming, and the ESCE formula was created using this algorithm configuration. This formula estimates ESCE with satisfactory precision. The use of the proposed formula in the early-stage building cost calculations is important not only for faster and easier cost calculation but also to prevent any differences that may arise due to the individual making the calculations. |
first_indexed | 2024-12-23T23:11:52Z |
format | Article |
id | doaj.art-e6f441c982f04377b741206784acc5bd |
institution | Directory Open Access Journal |
issn | 0350-2465 1333-9095 |
language | English |
last_indexed | 2024-12-23T23:11:52Z |
publishDate | 2021-09-01 |
publisher | Croatian Association of Civil Engineers |
record_format | Article |
series | Građevinar |
spelling | doaj.art-e6f441c982f04377b741206784acc5bd2022-12-21T17:26:39ZengCroatian Association of Civil EngineersGrađevinar0350-24651333-90952021-09-017308.81983210.14256/JCE.3013.202093A simple formulation for early-stage cost estimation of building construction projectsEsra DobrucaliIsmail Hakki DemirThis study is aimed at improving a formula that enables easy, correct, and fast estimation of an Early-Stage Cost of Buildings (ESCE). This formula, enabling estimation of ESCE, was developed by the authors based on artificial neural networks and gene expression programming. A quantity survey was conducted for a hundred construction projects, and a data set was created. This data set was analysed with many Artificial Neural Networks to determine the variables that affect ESCE. An algorithm configuration was made with Gene Expression Programming, and the ESCE formula was created using this algorithm configuration. This formula estimates ESCE with satisfactory precision. The use of the proposed formula in the early-stage building cost calculations is important not only for faster and easier cost calculation but also to prevent any differences that may arise due to the individual making the calculations.https://doi.org/10.14256/JCE.3013.2020early-stage cost of buildingsartificial neural networkgene expression programmingconstruction projectcost estimation |
spellingShingle | Esra Dobrucali Ismail Hakki Demir A simple formulation for early-stage cost estimation of building construction projects Građevinar early-stage cost of buildings artificial neural network gene expression programming construction project cost estimation |
title | A simple formulation for early-stage cost estimation of building construction projects |
title_full | A simple formulation for early-stage cost estimation of building construction projects |
title_fullStr | A simple formulation for early-stage cost estimation of building construction projects |
title_full_unstemmed | A simple formulation for early-stage cost estimation of building construction projects |
title_short | A simple formulation for early-stage cost estimation of building construction projects |
title_sort | simple formulation for early stage cost estimation of building construction projects |
topic | early-stage cost of buildings artificial neural network gene expression programming construction project cost estimation |
url | https://doi.org/10.14256/JCE.3013.2020 |
work_keys_str_mv | AT esradobrucali asimpleformulationforearlystagecostestimationofbuildingconstructionprojects AT ismailhakkidemir asimpleformulationforearlystagecostestimationofbuildingconstructionprojects AT esradobrucali simpleformulationforearlystagecostestimationofbuildingconstructionprojects AT ismailhakkidemir simpleformulationforearlystagecostestimationofbuildingconstructionprojects |